This Solicitation opportunity from Michigan was posted on September 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Detroit Public Schools Community District is soliciting proposals for the turn-key demolition of four vacant school buildings: Post Middle, Murphy Elementary-Middle, Stewart Performance Academy, and Pulaski Elementary-Middle. The comprehensive scope of work includes floodwater pumping, asbestos abatement, hazardous waste removal, the demolition of all building structures, foundations, and pavement, and full site restoration to a level grass area suitable for future redevelopment. Contractors are responsible for all labor, equipment, and supervision, including the installation of a 6-foot chain link perimeter fence and the procurement of all necessary permits and clearances. Technical specifications include the installation of a grouted CMU bulkhead wall at the Post Middle School tunnel and strict adherence to ASTM, ANSI, OSHA, and EPA standards for compaction and concrete testing.
Proposals are due electronically by October 7, 2026. Award selection is based on a 100-point scale, with 50 points allocated to the firm's capability and past performance and 25 points for pricing. Required submissions include a separate Excel-formatted cost proposal and a detailed tabbed response covering representations, certifications, and proof of insurance. The contract requires both bid and performance bonds from Treasury-approved sureties and mandates compliance with Michigan prevailing wage rates. Payment follows a 45-day cycle upon receipt of a proper invoice. Site-specific allowances are provided for underground storage tank assessments at Murphy and Pulaski schools and tunnel termination at Post Middle School.
General Info
Detroit Public Schools seeks proposals for turn-key demolition of four vacant school buildings.
PDF, High priority: read this firstwage-determination
HighAI Summary for Attachment E - Prevailing Wage Rates (Wayne County, MI): Official rate schedule for State of Michigan funded projects in Wayne County, updated November 1, 2025. The document specifies straight time, time and a half, and double time wage rates for various Power Equipment Operator classifications (Highway & Heavy and Commercial), including journeyman and apprentice levels.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment J - Phase 1 Floor Plans: Technical floor plans and architectural layouts for multiple educational facilities in Detroit, MI, including Loren M. Post Intermediate School, Murphy Elementary-Middle School, Stewart Elementary, and Pulaski Elementary. The document contains detailed room designations, spatial layouts, and revisions dating from 1920 through 2010.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment K - Phase 1 Site Plans - Demo Scope Area: Site plans identifying specific demolition scope areas for Phase 1, including locations at 8200 Midland St, 23901 Fenkell St, 13120 Buena Vista, and 19725 Strasburg in Detroit, MI.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Murphy Elementary/Middle School - Preliminary Hazardous Materials Survey Report: A preliminary hazardous materials survey report dated August 14, 2026, prepared by Atlas Technical Consultants LLC for the Detroit Public Schools Community District. The document identifies asbestos-containing materials (ACM) and universal waste at the Murphy Elementary-Middle School site to develop specifications for abatement and demolition activities in compliance with OSHA, EPA NESHAP, and AHERA standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Post Middle School - Preliminary Hazardous Materials Survey Report: A preliminary hazardous materials survey report dated August 14, 2026, prepared by Atlas Technical Consultants LLC for the Detroit Public Schools Community District. The document identifies asbestos-containing materials (ACM), universal waste, and other regulated materials at Post Middle School (8200 Midland Street, Detroit, MI) to establish specifications for abatement and demolition activities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Post Middle School Tunnel Bulkhead - Section 03001 Concrete: Technical specifications for Section 03001 - Concrete for the Post Middle School Tunnel Bulkhead project (dated August 6, 2026). The document details requirements for form materials, reinforcement materials (ASTM A 615 Grade 60), and concrete mix materials, including adherence to ACI and ASTM standards for quality assurance and submittals.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Post Middle School Tunnel Bulkhead Sketch (SK-1): Technical structural sketch (SK-1) dated 09/03/2026 for the Detroit Public Schools Community District. The document provides detailed specifications for the installation of a 12-inch fully grouted CMU bulkhead wall in the Post Middle School tunnel, including dowel requirements, anchor specifications, and general contractor notes regarding field verification and demolition of existing MEP piping.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Pulaski Elementary School - Preliminary Hazardous Materials Survey Report: Dated September 9, 2026, this report by Atlas Technical Consultants LLC for the Detroit Public Schools Community District identifies asbestos-containing materials (ACM) and universal waste at Pulaski Elementary School. The survey was conducted between August 7 and August 26, 2026, to develop specifications for abatement and demolition activities in compliance with OSHA, EPA NESHAP, and AHERA standards.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFP# 27-0037 - Bid Tender Form - Former Murphy Elementary-Middle School: A Bid/Tender Form for RFP# 27-0037 issued by the Detroit Public Schools Community District. The document outlines the pricing schedule for floodwater pumping, asbestos abatement, hazardous material removal, demolition, and site restoration at the Former Murphy Elementary-Middle School. It includes a detailed bid item table for mobilization, abatement, demolition, site restoration, UST assessment, and site security.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP# 27-0037 Bid/Tender Form - Former Post Middle School: Bid/Tender form for RFP# 27-0037 regarding floodwater pumping, asbestos abatement, waste removal, site security, demolition, and restoration at the Former Post Middle School in Detroit, MI. The document includes a detailed bid schedule with line items for mobilization, abatement, demolition, and site restoration.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFP# 27-0037 - Bid Tender Form - Former Pulaski Elementary-Middle School: A Bid/Tender Form for RFP# 27-0037 regarding the Former Pulaski Elementary-Middle School in Detroit, MI. The document outlines the pricing schedule for floodwater pumping, asbestos abatement, hazardous waste removal, demolition, site restoration, and UST assessment. It includes a detailed bid item table for cost proposals and requires a project schedule for submission.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFP# 27-0037 - Bid Tender Form - Former Stewart Performance Academy: A Bid/Tender Form for RFP# 27-0037 issued by Detroit Public Schools Community District. The document outlines the pricing schedule for floodwater pumping, asbestos abatement, hazardous waste removal, demolition, and site restoration at the Former Stewart Performance Academy located at 13120 Wildemere Street, Detroit, MI.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 27-0037: Turn-Key Demolition of Phase 1 Vacant Buildings 2027: Request for Proposal (RFP) issued by the Detroit Public Schools Community District (DPSCD) for the turn-key demolition of four former school buildings (Post Middle, Murphy Elementary-Middle, Stewart Performance Academy, and Pulaski Elementary-Middle). The scope includes asbestos abatement, hazardous waste removal, pumping floodwater, demolition of structures and site improvements, and site restoration. Proposals are due by October 7, 2026, via electronic submission.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Stewart Performance Academy - Preliminary Hazardous Materials Survey Report: A preliminary hazardous materials survey report dated August 14, 2026, prepared by Atlas Technical Consultants LLC for the Detroit Public Schools Community District. The document identifies asbestos-containing materials (ACMs), universal waste, and other regulated materials at Stewart Performance Academy to establish specifications for abatement and demolition activities.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
1 update
PhaseClosed
Posted
Solicitation
Notice updated
Notice details unchanged. Attachments may have changed.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.