Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFP-DS-0147 Server Room Construction at ECLWRF

Closed
RFP-DS-0147State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
DB Major M&R Sector Lake MIchigan, INTERNAL
Solicitation # 70ZS0127RCLEV00018
This Design-Build Major Maintenance and Repair project for U.S. Coast Guard Sector Lake Michigan in Milwaukee, Wisconsin, is estimated to be valued between $5 million and $10 million. The scope of work includes base requirements for remodeling the Sector Command Center, building envelope repairs, and HVAC reconfiguration, with optional items for roof and boiler replacement at the Station/UPH Building. The project involves comprehensive architectural and engineering efforts, including electrical demolition and installation, mechanical upgrades to heat pump and VRF AC units, and the reconfiguration of second-floor restrooms. All work must comply with the International Building, Fire, Mechanical, and Plumbing Codes, as well as ADA standards and USCG configuration standards for Command Center spaces. The contract is a firm fixed-price task order with a projected period of performance of 350 calendar days. Award will be made to the lowest total priced responsive offeror, with evaluations based on fairness and reasonableness compared to independent government cost estimates. Proposals are due by December 17, 2026, and must be submitted via email to the Contract Specialist. Key requirements include the provision of performance and payment bonds within 10 business days of award, adherence to the Buy American Act, and compliance with strict physical security and classified information management protocols for personnel accessing the facility. No set-aside status is specified for this solicitation.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 involves the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, and a full NFPA-compliant fire suppression system. Additionally, the project requires the replacement of electrical distribution, lighting, low-voltage systems, and building automation controls, alongside site improvements such as paving, drainage upgrades, and hazardous materials abatement. The estimated project cost is between $10 million and $25 million, with a completion period of 730 days. The contract is awarded based on the lowest price, with evaluation focusing on the combined cost of ELIN 0001 for building renovation and ELIN 0002 for paving removal and replacement. Proposals valued at $150,000 or more require a bid bond of 20% of the proposal amount, as well as payment and performance bonds. Key personnel requirements include a stand-alone Quality Control Manager, while the Superintendent and Site Safety and Health Officer roles may be combined. All invoices must be submitted via Wide Area Work Flow. The proposal deadline is December 2, 2026, at 2:00 PM. There is no specified set-aside status for this solicitation.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
This Design-Build contract, issued by NAVFAC Northwest ROICC Kitsap, focuses on repairing fire sprinkler deficiencies at Building 290 and the adjoining covered loading dock platform, Building 719, at the Puget Sound Naval Shipyard in Bremerton, Washington. The contractor is responsible for producing final design documentation according to Navy and Marine Corps Design Procedures, providing all necessary construction materials, labor, and supervision, and conducting performance testing. Key technical objectives include extending fire sprinklers to the loading dock platform to resolve a Risk Assessment Code Level 4 deficiency, installing backflow preventers for the north and south 6-inch diameter wet pipe sprinkler system risers in the basement, and ensuring sprinkler control valves in elevator pits are locked open and monitored by the fire alarm system. The project is an 8(a) Multiple Award Construction Contract (MACC) with a Firm Fixed-Price structure and an estimated magnitude between $1 million and $5 million. The period of performance is 440 days from the date of the task order award. Evaluation is based on price and MACC past performance. Proposals must be submitted via the PIEE portal by December 16, 2026. The scope includes a requirement for a hazardous material survey to validate existing reports and adherence to strict safety and security standards, including EM 385-1-1 and cybersecurity protocols for facility-related control systems.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a design-build project for the renovation and modernization of Facility #6594 (Transfer Facility) at Naval Base Kitsap Bangor, Washington. The project is estimated between $10 million and $25 million and is structured in two phases to ensure the facility remains operational and mission-capable throughout the process. Phase 1 involves the completion and approval of designs for both phases, including the construction of a 400 square foot addition for forklift battery charging and various infrastructure upgrades. Phase 2 focuses on the installation of new building equipment, including a prefabricated paint booth and the replacement of a 40-ton bridge crane. The scope also encompasses demolition of deteriorated components, HVAC and electrical upgrades, and the installation of UFC and NFPA compliant fire sprinkler systems and an updated ordnance grounding system. The contract is a DO rated order with a base bid (CLIN 0001) and an option (CLIN 0002), with a required commencement within 15 calendar days of award and completion of the base bid within 360 calendar days. Award is based on price and MACC past performance. The contractor must adhere to strict security protocols, cybersecurity standards (including NIST SP 800-171), and environmental regulations from the Puget Sound Clean Air Agency. Key requirements include the provision of performance and payment bonds within ten working days of award and the use of electronic software for Davis-Bacon Act certified payrolls. Proposals must be submitted via the PIEE portal by December 7, 2026, at 11:00 am local time.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
Federal
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
This project involves the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The scope includes a 12,920 square foot laboratory and office facility featuring a steel frame, shallow foundations, a metal standing seam roof, and masonry and metal panel exterior walls. Additionally, the project encompasses comprehensive site improvements such as landscaping, drainage, parking, exterior lighting, and an underground stormwater retention system. Option 1 includes the construction of a separate 17,978 square foot laboratory facility and the demolition of Building 1272T. The solicitation is open to Small Businesses, including SAM.gov designated Small Disadvantaged Businesses, SBA certified Women-Owned Small Businesses, HUBZone Small Businesses, Veteran Owned Small Businesses, and Service-Disabled Veteran Owned Small Businesses. Pricing is requested for a wide range of trades, including demolition, abatement, structural steel, mechanical, electrical, and plumbing. The project is exempt from sales tax and adheres to Davis Bacon Wage Rates. Interested parties should contact Rahul Maheshwari to receive bid invitations and documents via BuildingConnected.
J&J CONTRACTORS, INC.

POSTED

about 5 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
Federal
Site Visit (required) Replacement of existing damaged fire rated doors and frames-
Solicitation # 26-141
Solicitation 26-141 is a subcontracting opportunity for the Atterbury Job Corps Center in Indiana to remove and replace damaged fire-rated doors and frames within the center's cafeteria. The project requires the installation of new fire-rated doors while reusing existing closure systems and push bars. All work must comply with EPA and OSHA regulations, as well as local and state building codes. The contract is a single lump sum agreement with a one-year guarantee on workmanship and manufacturer warranties. Award will be based on best value, evaluated across price, quality, past performance, and schedule, with a total of 100 available points. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Interested bidders must attend a mandatory site visit on December 1, 2026, and submit typed proposals on company letterhead by December 11, 2026. Required documentation includes a detailed cost breakdown, a timeline for substantial completion, a valid Indiana Contractor's License, a W9, a completed Vendor Questionnaire, and certification of compliance with Davis-Bacon Act wage rates. Payment terms are Net 30.
Atterbury Job Corps – Adams & Associates

POSTED

about 5 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

West Basin Municipal Water District is soliciting proposals under RFP-DS-0147 for the construction of a dedicated server room at the Edward C. Little Water Recycling Facility in California. The project involves the conversion of existing office space into a specialized facility designed to support an ongoing Distributed Control System Replacement Project. Key technical requirements for the new server room include the installation of dedicated air conditioning and precision cooling, environmental monitoring, fire suppression systems, and power distribution to accommodate new server equipment. The project must be completed before the end of the 2027 calendar year to ensure readiness for the incoming hardware. Interested parties were invited to a non-mandatory pre-proposal conference on October 6, 2026. Proposals are required to be submitted by the deadline of October 15, 2026, although some documentation indicates a date of October 22, 2026. David Shull serves as the primary point of contact for this solicitation.

General Info

West Basin Municipal Water District seeks proposals for a server room construction by 2027.

Documents

1
PDF, High priority: read this first19 pages · rfp
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 22 days
  • Building 262 Renovations FLETC GlyncoOpen now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → West Basin Municipal Water District
Contacts1 person available
OfficeN/A

Full Description

Show more
Proposals are being accepted by West Basin Municipal Water District (West Basin), a Municipal Water District, for Server Room Construction at ECLWRF. This project aims to convert existing office space into a dedicated server room to support an ongoing Distributed Control System (DCS) Replacement Project where new server equipment will be procured. The new server room should have dedicated air conditioning, environmental monitoring, fire suppression, and power distribution. This server room should be completed before the end of calendar year 2027 to be ready for the new servers. Click on this link for RFP-DS-0147 details and attachments: https://procurement.opengov.com/portal/westbasin/projects/301392 Pre-Proposal Conference (Non-Mandatory): October 6, 2026, 2:00pm Microsoft Teams meeting Join: https://teams.microsoft.com/meet/22468178885174?p=Iu6R0QYOXY4aN3tGh4 Meeting ID: 224 681 788 851 74 Passcode: tZ24wU9R ________________________________________ Need help? | System reference Dial in by phone Sign up to see this detail,,328387517# United States, Los Angeles Find a local number Phone conference ID: 328 387 517#

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS