Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on December 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFP - Engineering Design Services for the 33rd Ave W Ring Road Project

Closed
3905State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 8 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The project entails a multi-phase engineering design and construction effort to improve street and traffic infrastructure around the North Lynnwood Costco area, encompassing key corridors such as 33rd Ave W, Maple Road, Beech Road, SR-525, Alderwood Mall Parkway, and nearby streets. The initiative addresses current and projected traffic demands with a focus on enhancing safety and connectivity. Phase 1 involves identifying short-term (1–2 years) and long-term (3–20+ years) transportation improvements and developing a construction bid package for near-term solutions. Subsequent phases will produce detailed plans, specifications, and cost estimates for phased implementation per the plan formulated by the consultant. This approach is designed to systematically reduce congestion and improve circulation through targeted traffic engineering measures, roadway design, surveying, environmental permitting, and public engagement. The City of Lynnwood is seeking qualified consulting firms through a solicitation issued December 9, 2025, with proposals due January 13, 2026. The contract term is expected to span 24 months with potential extensions. Consultants must provide comprehensive engineering design services including civil design, traffic engineering, stormwater management, surveying, and community outreach. The selection criteria prioritize the experience and qualifications of the project team, relevant past projects, and demonstrated understanding of risks and permitting strategies. The project incorporates federal regulations regarding nondiscrimination and accessibility, with subcontractor compliance and reporting requirements in place. Insurance, confidentiality, and organizational conflict of interest provisions are specified to safeguard contractual and legal obligations. Community involvement is a significant component, as illustrated by prior engagement efforts presenting multiple traffic improvement options such as signal removal, roundabouts with U-turns, and roadway realignment to optimize flow around major intersections. Deliverables include electronic engineering data submissions and progress reports, and the contract follows a cost plus fixed fee structure with detailed compliance and administrative conditions tied to federal and local law. The work is managed by the City of Lynnwood Public Works Engineering department, with contact points provided for technical and administrative support.

General Info

This project will involve the design and construction of street/traffic improvements in and around the North Lynnwood Costco area. These improvements are necessary to accommodate existing and future traffic volumes, as well as to enhance overall safety and connectivity. The planning area includes, but is not limited to, 33rd Ave W, Maple Road, Beech Road, SR-525, Alderwood Mall Parkway, 30th Pl W, 182nd St SW, and 184th St SW. Phase 1 will identify a list of transportation projects recommended for short-term implementation (1–2 years) and long-term implementation (3–20+ years). Phase 1 will also develop short-term solutions construction bid package. Future phases will involve preparing plans, specifications, and cost estimates for the improvements identified in the Phase 1 study, consistent with the phasing plan developed by the Consultant. It is anticipated that multiple phases will be required to complete the improvement.

Place of Performance

WA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Public Works Engineering
Contacts2 people available
OfficeLynnwood, WA, 98036, USA
Office AddressLynnwood, WA, 98036, USA
Contacts
Katie McKeePublic Works Administration Assistant

Interested Companies (16)

PsomasSanta Ana, CA
ProDimsKirkland, WA
EnviroIssuesSeattle, WA

See All 16 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
This project will involve the design and construction of street/traffic improvements in and around the North Lynnwood Costco area. These improvements are necessary to accommodate existing and future traffic volumes, as well as to enhance overall safety and connectivity. The planning area includes, but is not limited to, 33rd Ave W, Maple Road, Beech Road, SR-525, Alderwood Mall Parkway, 30th Pl W, 182nd St SW, and 184th St SW. Phase 1 will identify a list of transportation projects recommended for short-term implementation (1–2 years) and long-term implementation (3–20+ years). Phase 1 will also develop short-term solutions construction bid package. Future phases will involve preparing plans, specifications, and cost estimates for the improvements identified in the Phase 1 study, consistent with the phasing plan developed by the Consultant. It is anticipated that multiple phases will be required to complete the improvement.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS