Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on February 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFPQ 26024 Middle Oconee East Trunk Sanitary Sewer Improvements Phase 1A

Closed
26024State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Unified Government of Athens-Clarke County is seeking pre-qualified responsible Construction General Contractors in accordance with the Georgia Public Works Law for the Middle Oconee East Trunk Sanitary Sewer Improvements - Phase 1A project. The work involves replacing an aging 30-inch concrete pipe trunk line and manholes along the Middle Oconee River with a new 48-inch ductile iron pipe and 9-foot diameter precast structures. The scope includes installing approximately 4,250 linear feet of 48-inch ductile iron pipe, as well as additional sections of 16-inch and 12-inch ductile iron pipe, 400 linear feet of 72-inch casings for stream crossings with anchors, and 26 precast concrete manholes. The project begins at the Middle Oconee Water Reclamation Plant and extends toward the Macon Highway Bridge, including a 160-foot jack and bore under Macon Highway, with most of the pipe work being same trench replacement or parallel trench installation. Additional responsibilities include erosion control, landscaping, creek crossings, groundwater dewatering, and the repair or replacement of infrastructure such as pavement, sidewalks, fences, and curbs. The project requires extensive traffic control and large-scale bypass pumping throughout its duration to maintain flow and operational integrity during construction. Contractors must provide all materials, labor, equipment, and construction services necessary to complete the project, which is essential for upgrading and maintaining sanitary sewer infrastructure in the region. The solicitation was posted on February 3, 2026, with a response deadline of March 2, 2026, and the primary contact for inquiries is Rena Durie with Athens-Clarke County Government.

General Info

Athens-Clarke County seeks contractors for sewer pipe replacement, manholes, and infrastructure repairs.

Documents

1
PDF, High priority: read this first13 pages · rfpq
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Requisition 21MA000516 to is issued for design build water tower repairs and recertification at the Germantown Campus in accordance with the American Water Works Association AWWA for the Firm-Fixed P…Open now
  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 12 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Athens-clarke County Government
Contacts1 person available
OfficeN/A

Full Description

Show more
The Unified Government of Athens-Clarke County desires to solicit Pre-Qualification Applications in accordance with the Georgia Local Government Public Works Construction Law (the ¿Georgia Public Works Law¿) from responsible Construction General Contractors.
Responsible General Contractors are to provide all construction, materials, equipment, and labor to complete the Middle Oconee East Truck Sanitary Sewer Improvements - Phase 1A:
This work shall replace an aging 30-inch concrete pipe trunk line and manholes located along the Middle Oconee River with a proposed 48-inch ductile iron pipe (DIP) and new 9ft diameter precast structures. This shall include the installation of approximately 4,250 linear feet (LF) of 48-inch Ductile Iron Pipe (DIP), approximately 50 linear feet (LF) of 16-inch Ductile Iron Pipe (DIP), approximately 200 linear feet (LF) of 12-inch Ductile Iron Pipe (DIP), and 400 linear feet of 72-inch casings with anchors for stream crossings (some jack and bore), and 26 precast concrete manholes. This work starts at the Middle Oconee Water Reclamation plant and ends in the vicinity of the Macon Highway Bridge over the Middle Oconee. Some of this work shall be new trench work located parallel to the existing facilities, most shall be same trench replacement. There is one approximately 160 linear foot (LF) jack and bore under Macon Highway. All interconnections to the truck line shall be replaced a minimum 50 linear feet (LF) up stream from the trunk line with 12-inch Ductile Iron Pipe (DIP) or larger and a manhole installed.
Along with this, work shall include erosion control and landscaping, several creek crossings, groundwater dewatering, as well as repair or replacement of items such as pavement, sidewalk, fences, and curbs. This work shall require large scale bypass pumping for the duration of the project.
Work includes traffic control and requires larger scale bypass pump arounds for the duration of the project. Summary: The work t

More opportunities from Georgia → Athens-clarke County Government

Same awarding agency

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS