This Solicitation opportunity from Georgia was posted on February 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
RFQ-484-02192026DB SR 25 at Darien River Bridge Replacement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Georgia Department of Transportation is seeking a Design-Builder to undertake the design and construction of a new bridge over the Darien River on SR 25/US 17/SR 99/N. Walton Street. The project involves constructing a 1,441-foot-long, 55-foot-wide bridge positioned approximately 40 feet west of the existing alignment. To ensure continuous traffic flow, the construction will be phased: first building part of the new bridge to shift traffic onto it, then removing the old bridge and completing the remaining span. The project corridor extends about half a mile and includes enhancements for pedestrians, such as a shared-use path and sidewalk. The contract will be awarded through a Two-Phase Best Value selection process to a Design-Builder team consisting of a Lead Contractor and a Lead Design Consultant. The solicitation was posted on February 19, 2026, with a response deadline of March 26, 2026. The responsible agency contact is Elise Snider, reachable via email or phone. This procurement is managed by the Georgia Department of Transportation, aiming to ensure a well-coordinated, efficient project delivery balancing construction activities with maintaining traffic and pedestrian access throughout the project duration.
General Info
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 5 days
- Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 9 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
This Project will be awarded to a Design-Builder utilizing a Two-Phase Best Value method. A Design-Builder includes a Lead Contractor and a Lead Design Consultant working together to design and construct the project. See the RFQ for additional details.
More opportunities from Georgia → Department of Transportation-2
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
