Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from North Carolina was posted on January 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFQ-Progressive Design-Build Services for the Bryant Farms Road Extension Phase II Project (Rea Road to Ardrey Kell Road)

Closed
269-2026-166State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, subsurface investigation, and shoring; pipeline and utility installation involving tunneling, boring, jacking, and cathodic protection; and surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Required materials and services also encompass ready mix supply, precast concrete, and the implementation of storm water pollution prevention measures. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. Responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders are encouraged to demonstrate an ability to maintain labor harmony, noting that Kiewit is a signatory to several collective bargaining agreements. Quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 14 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The City of Charlotte is seeking Progressive Design-Build services for the Bryant Farms Road Extension Phase II Project, which involves extending Bryant Farms Road by approximately 1.2 miles from Rea Road to Ardrey Kell Road. The project will include constructing a two-lane road with a center turn lane or median, along with curb and gutter, 8-foot planting strips, and 12-foot multi-use paths to accommodate pedestrian and bicycle traffic. Additional features include street lighting, landscape buffers in selected sections, and two crossings—one over an unnamed stream west of Reavencrest Park Drive and another over Flat Branch creek. The project scope also incorporates the installation of a new 36-inch water main spanning roughly 6,600 feet. Proposals for the project are due by February 17, 2026, with the solicitation having been posted on January 21, 2026. While attendance at the Pre-Proposal Conference held at the Charlotte-Mecklenburg Government Center is not mandatory, it is highly recommended for prospective proposers. The City of Charlotte’s primary contact for this solicitation is Penny Helms. The project is managed under the local government sector in North Carolina and aims to enhance transportation infrastructure along with pedestrian and bicycle facilities in the area.

General Info

City of Charlotte seeks design-build for 1.2-mile road, multi-use paths, water main installation.

Documents

1

RFQ #269-2026-166: Bryant Farms Road Extension Phase II

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → City of Charlotte
Contacts1 person available
OfficeNC, USA
Office AddressNC, USA
Contacts
Penny Helms

Full Description

Show more
The City of Charlotte is seeking Progressive Design-Build services to design and construct the Bryant Farms Road Extension Phase II Project. This project will extend Bryant Farms Road, approximately 1.2 miles, from Rea Road to Ardrey Kell Road which will include a two-lane road, with center turn lane/median, curb and gutter, 8-foot planting strips and 12-foot multi-use paths for pedestrian and bicycle facilities, streetlights, and landscape buffers in selected areas. The Project will also include a crossing over unnamed stream west of Reavencrest Park Drive and a crossing over Flat Branch creek. A new 36” water main of 6600 feet will be part of the project. In-Person Meeting Location: Charlotte-Mecklenburg Government Center (CMGC), Room # 280. 600 East 4th Street, Charlotte, NC 28202 Attendance at the Pre-Proposal Conference is not mandatory but is highly recommended.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS