Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on March 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFQ State Project No. 108-TBD Moosup Valley Trail Extension

Closed
1207State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work involves mowing, string trimming, edging, and cleanup for approximately 50 acres of maintained property and over 35 buildings. The contractor is responsible for providing all labor, supervision, equipment, materials, fuel, transportation, and insurance. Performance is based on a weekly schedule, with a requirement to maintain turf height between 3 and 4 inches. Any rejected work or identified deficiencies must be corrected within 48 hours at no additional cost to the government. The contract consists of an initial one-year term with the option for four additional one-year renewals. Award will be granted to a responsible offeror whose quote is technically acceptable and represents the lowest price. To be deemed technically acceptable, offerors must provide evidence of Kentucky state registration and licensing, verification of eligibility via the SAM portal, a detailed fixed-price quote, and a comprehensive submission including a technical proposal, company qualifications, three references, an equipment list, and a safety program. Compliance with the Federal Acquisition Regulation (FAR), OSHA, and EPA regulations is mandatory. Specifically, the contract adheres to the Davis-Bacon Act and Contractor Wage Rate Requirements under Wage Determination Number KY20210041. Payment is subject to net terms and requires the submission of weekly certified payroll and a signed Statement of Compliance with each invoice. Additionally, contractors must provide proof of their ability to secure performance and payment bonding. Quotes must be submitted electronically to the purchasing agent by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

24 minutes ago

DEADLINE

in about 8 hours
NAICS: 561730
New
SLED
IT, Lot Cleanup, Vegetation Control, Debris Removal, and Metal Product Decommissioning and Removing
Solicitation # RFP-Lot-Cleanup-CCT-IT-10_15.pdf
The Confederated Tribes of the Colville Reservation is soliciting proposals for comprehensive lot cleanup, vegetation control, debris removal, and metal product decommissioning services for five designated lots located in Nespelem and Omak, Washington. The selected contractor will be responsible for providing all labor, equipment, and transportation to perform grass cutting, vegetation trimming, and the removal of loose garbage and abandoned materials. Additionally, the scope includes the decommissioning and removal of authorized products, equipment, and fixtures, with a strict requirement to notify the owner of any hazardous or contaminated materials discovered. The project concludes with a final site inspection to ensure all properties are left in a clean, orderly, and safe condition. Proposals are due by November 5, 2026, and must be submitted to the CCT IT Department. The contract term is for an as-needed period not to exceed three years, with payments contingent upon the availability of funds in the tribal treasury. Evaluation is based on a 100-point scale considering reliability, budget, and TERO designations, with a specific preference for responsible Indian Offerors whose prices are within 10 percent of the lowest non-Indian bid. Awardees must provide proof of insurance and sign a certification regarding debarment and suspension. Furthermore, any contract exceeding 100,000 dollars requires a performance bond, otherwise, a 25 percent retainage will be applied.
Confederated Tribes of the Colville Reservation

POSTED

about 15 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The project involves the construction of approximately 12,500 feet of a multi-use trail extending from Moosup Center to Plainfield’s Central Village, funded by the Transportation Alternatives Program administered by the Connecticut Department of Transportation. The scope of work includes not only the trail itself but also minor drainage improvements, landscaping, installation of concrete sidewalks and curbing, crosswalks, curb ramps, a pedestrian bridge, and a mid-block crossing equipped with a Rectangular Rapid Flashing Beacon to enhance pedestrian safety and accessibility. The project aims to improve connectivity and safety for pedestrians and cyclists within the community. The contract, titled RFQ State Project No. 108-TBD Moosup Valley Trail Extension, is set for a solicitation response deadline of April 7, 2025, with project costs estimated between two and five million dollars. The Town of Plainfield, acting as the contracting agency, is seeking qualified firms under NAICS code 561730. Interested parties can contact Shannon Fagan via email or phone for further details. The project is part of a federally aided initiative to promote alternative transportation options and enhance local infrastructure in Connecticut.

General Info

Place of Performance

CT, USA

Set-Aside

NONE

Documents

1

RFQ 1207 Moosup Valley Trail Extension

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → Town of Plainfield
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The project is funded by the Transportation Alternatives (TA) Program administered by the Connecticut Department of Transportation, Federal Aid Project No. TBD. The improvements will include construction of approximately 12,500 feet of bituminous concrete multi-use trail extending from Moosup Center west to Plainfield’s Central Village. The project also includes minor drainage improvements, minor landscaping, concrete sidewalks/curbing, crosswalks/curb ramps, pedestrian bridge and a mid-block crossing with Rectangular Rapid Flashing Beacon.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS