Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rice Bridge No. 6543 Replacement

Closed
BC25757MJ0000Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in 2 months

DEADLINE

in 2 months

AI Contract Overview

Show more

This contract involves the replacement of an existing temporary 24.4-meter Bailey bridge with a new, permanent 30-meter single-span bridge. The new structure will feature a waterproof membrane and an asphalt wearing surface to enhance durability and usability. In addition to the bridge construction, the project includes the development of approximately 200 meters of gravel surfaced roadway, paved asphalt aprons, and improved bridge approaches. Necessary roadway signage and landscaping or seeding efforts will also be part of the project scope. Environmental considerations are addressed through the installation of riprap protection and habitat restoration on both banks of the creek and within the creek channel itself. The project also requires the removal of the existing temporary Bailey bridge. The solicitation is issued by the Government of Canada's Southern Interior Regional Office, with all project-specific inquiries directed to the designated contact via email. The response deadline for submissions is May 27, 2026.

General Info

Replacing 24.4m Bailey bridge with 30m permanent bridge, including roadway, signage, and environmental restoration.

Agency

Government of Canada → Southern Interior Regional Office

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Southern Interior Regional Office
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Southern Interior Regional Office
Office AddressN/A
Contacts
Contracting Authority

Full Description

Show more
Replacement of the temporary 24.4m Bailey bridge with a new, permanent 30m long single-span bridge with a waterproof membrane and asphalt wearing surface. Construction of approximately 200m of gravel surfaced roadway, paved asphalt aprons and bridge approaches, signing, and landscaping/seeding. Riprap protection and habitat restoration features on both creek banks and within creek channel. Removal of existing Bailey bridge.Please direct all project specific enquiries related to this RFx by email to the Project Contact identified below and on the “Opportunity Details” tab under Additional Information SCT3.Project Contact Name: Kyle DrummondEmail Address: Kyle@integrisco.ca