Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New York was posted on March 6, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rice Road Water Treatment Plant Infrastructure Improvements Project

Closed
2119730State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
DEMOLITION OF THE CAMP HILL SQUARE APARTMENTS
Solicitation # 2027-RFP-033
Solicitation 2027-RFP-033 is a request for proposals issued by the Housing Opportunities Commission of Montgomery County for the demolition and waste removal of the Camp Hill Square Apartments in Gaithersburg, Maryland. The project scope involves the demolition of five apartment buildings containing 51 vacant units and a management office, including the removal of all above-grade structures, slabs, foundation walls, footers, and side wall walkways. Additionally, the contractor is responsible for removing above-grade utilities, capping or abandoning underground utilities, and clearing dumped materials and interior fencing at the neighboring Emory Grove Village parcel. The selected firm will be tasked with procuring all necessary Montgomery County demolition and raze permits, managing the removal of hazardous materials such as asbestos, and stabilizing the property according to the approved Sediment Control Plan. The contract features an initial performance period of four months from the Notice to Proceed. Proposals are due by October 30, 2026, via the OpenGov Procurement Portal and are evaluated based on schedule (20%), price (15%), and MFD participation. Key compliance requirements include adherence to Davis-Bacon and Maryland Prevailing Wage Laws, mandatory background screenings for all personnel, and participation in the HOC Works Program. Awardees must provide 100% payment and performance bonds, proof of insurance, and execute HUD certifications regarding debarment and suspension. HOC will retain 5% of payments until final acceptance, with liquidated damages of up to 1,000 dollars per day for incomplete work.
Real Estate

POSTED

about 3 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

W.M. Schultz Construction, Inc. is seeking qualified subcontractors, service providers, material suppliers, and trucking firms to participate in the Rice Road Water Treatment Plant Infrastructure Improvements Project in Schenectady, NY. The scope of work includes installing three new submersible vertical turbine well pumps with associated discharge heads, motors, VFDs, and piping, as well as constructing three prefabricated steel well house buildings and meter vaults, each equipped with interior piping, flow meters, controls, HVAC, and electrical systems. Additionally, yard piping improvements involve demolishing existing piping, installing new ductile iron water distribution lines, re-routing chemical feed lines with injection ports and leak detection, and constructing a precast concrete valve vault. Site enhancements such as asphalt replacement, topsoil and seeding, and flood berm modifications are also part of the project. Contractors must demonstrate registration with the NYSDOL as mandated by Labor Law Section 220-I. The project emphasizes MWBE participation, with a goal of 20%, and encourages certified minority and women-owned businesses to submit quotations. The contract duration aligns with the completion of the work, with a bid response deadline of March 26, 2025. The project is located at 48 Rice Road, Schenectady, NY, and is managed under a solicitation with a total contract value estimated between five and fifteen million dollars. Interested parties can access detailed project documents through the provided secure link.

General Info

Place of Performance

NY, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew York Subcontract Opportunities
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
W.M. Schultz Construction, Inc. (Schultz), bidding as a prime contractor, welcomes quotes from all qualified subcontractors, services, material suppliers and trucking firms for complete or portions of the work for the following project: Rice Road Water Treatment Plant Infrastructure Improvements Project Schenectady, NY Contract 3G- General Construction   NOTE: SCHULTZ IS ACTIVELY SEEKING AND ENCOURAGING CERTIFIED MINORITY AND WOMEN OWNED BUSINESSES TO SUBMIT QUOTATIONS ON THIS PROJECT   Summary of Work: Installation of 3 new submersible vertical turbine well pumps including discharge heads, motors, variable frequency drives (VFD), and associated piping. Installation of 3 new prefabricated steel well house buildings, including interior piping, flow meters, controls, HVAC equipment, and electrical components. Installation of 3 new prefabricated, steel meter vaults including interior piping, flow meters, controls, HVAC equipment, and electrical components. Yard piping improvements including demolition of existing piping sections, and installation of new ductile iron water distribution piping, re-routing and installation of new chemical feed lines with new injection ports and leak detection, and a precast concrete valve vault. Site improvements including asphalt replacement, topsoil and seeding, and modifications to the existing flood berm. Contractors are required to provide proof of registration with NYSDOL as required by Labor Law Section 220-I. Link to access secure project Box Link, containing all current project documents: Rice Rd WTP Bid Docs Service-Disabled Veteran-Owned Set Aside: No Total MWBE Participation Goals: 20% Due date:03/26/2025 Contract term: Duration of Work County(ies): Schenectady Location: 48 Rice Rd, Schenectady, NY 12306 This is a subcontract opportunity issued by W.M. Schultz Construction, Inc.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS