Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rideau Canal Lighting Rehabilitation Project.

Closed
NCC-DC-039926-RFQInternational

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
SLED
ITB SPBN262013 B197 Concrete Pad and Structural Metal Overhang (Otis ANGB, MA)
Solicitation # BD-27-1069-MILDV-40000-133298
The Massachusetts Military Division is soliciting bids for the design and construction of a 20ft x 20ft high-performance concrete pad and a structurally sound all-metal overhead canopy at the Otis Air National Guard Base in Barnstable, Massachusetts. With an estimated value of 70,000 dollars, the project requires materials capable of resisting coastal salt-air and freeze-thaw cycles, adhering to the 10th Edition of the Massachusetts State Building Code and DoD Unified Facilities Criteria. Interested bidders must attend a mandatory site visit on September 17, 2026, and submit their proposals via COMMBUYS by the deadline of September 24, 2026. The contract mandates strict compliance with several legal and administrative requirements, including the payment of prevailing wages and the provision of a 5 percent bid bond for bids over 50,000 dollars and a 50 percent payment bond for projects exceeding 25,000 dollars. Contractors must provide a Certificate of Non-Collusion, a Massachusetts Tax Compliance Certificate, and an Authorized Signatory Listing Form. Additionally, all personnel must be REAL ID compliant to gain access to the facility. The agreement is governed by the Commonwealth Terms and Conditions and General Conditions for site work under Massachusetts General Law chapter 30 section 39M, and contractors are encouraged to utilize Electronic Funds Transfer and the Prompt Payment Discount form for expedited compensation.
MILDV - Military Division

POSTED

about 21 hours ago

DEADLINE

in 13 days
NAICS: 238120
New
Federal
Metal Stairs Fabrication and Installation
Solicitation # N0017326Q1903
Solicitation N0017326Q1903 is a firm-fixed-price request for quote issued by the Naval Research Laboratory for the design, fabrication, and installation of code-compliant interior metal stairs to provide access to the mechanical room penthouse in Building A59, located in Washington, DC. This requirement is a 100% small business set-aside under NAICS code 238120. The scope of work includes providing a project schedule within three weeks of award and submitting preliminary shop drawings, anchoring system designs, and accessory drawings to the Engineer in Charge prior to production. All work must adhere to Unified Facilities Guide Specifications, Unified Facility Criteria, and EM 385-1-1 safety standards. The government will award the contract using the Lowest Price Technically Acceptable (LPTA) process, evaluating technical quotes and past performance on a pass/fail basis. To be considered, offerors must submit three separate volumes: a technical quote including a preliminary shop drawing, a past performance volume, and a price quote. A mandatory site visit was scheduled for September 3, 2026, and the final response deadline is September 15, 2026. The period of performance for the project is from September 24, 2026, to November 30, 2026. Payment and invoicing shall be processed electronically through the Wide Area WorkFlow system.
Naval Research Laboratory

POSTED

about 23 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The National Capital Commission is soliciting quotations under solicitation number NCC-DC-039926-RFQ for the fabrication and installation of new railings along the Eastern and Western Pathways of the Rideau Canal within the National Capital Region. This is a Firm Fixed Price procurement initiated as a Request for Quotations with evaluation based on lowest compliant bid, and responses are due by May 13, 2026, at 2:00 PM Eastern Time. The work involves removing existing railings and installing new ones totaling approximately 1,950 meters, with a separate pricing option available for removal only of 770 meters, though no unit or total prices are provided in the solicitation, rendering the estimated contract value unspecified. Performance must occur at designated locations within the National Capital Region, with all materials handled in compliance with Canadian environmental regulations including O.Reg. 347, TDGA, CEPA, and ASTM E3073, while also adhering to waste separation, traceability via weigh bills, and documentation through used building material receipts. Contractor responsibilities include submitting shop drawings, product data, samples, and mock-ups for Engineer approval, ensuring compliance with SI metric units, and maintaining all standards referenced in the Contract Documents. Contractors must meet stringent security, safety, and ethical obligations: all personnel require Reliability level security screenings or higher depending on access level, and must safeguard classified NCC information in alignment with Government Security Policy. A qualified Health and Safety Coordinator with two years of relevant experience must be physically present on-site at all times, alongside a documented site-specific safety program, worker training records, and material safety data sheets. Contractors are required to submit Worker’s Compensation Clearance Certificates updated every 60 days for projects exceeding 60 days and provide historical injury reports for the past three years. Immediate work stoppage is mandated upon discovery of human or archaeological remains, and any personnel deemed a national security risk must be removed without notice. Subcontracting is permitted only if subcontractors assume full responsibility for security and compliance. The NCC retains broad termination rights for noncompliance with safety, security, or contractual obligations, and may conduct unannounced audits. Payment is governed by progress claims and final completion certificates tied to substantial performance within 30 days and final completion within 60 days, though specific payment office details, invoicing platforms, or accounting codes are not provided. Proposals must be submitted exclusively via email under 30 MB to B

General Info

NCC seeks contractors to fabricate and install railings along Rideau Canal pathways by May 13, 2026.

Agency

Government of Canada → National Capital CommissionView Agency

NAICS

238120 - Structural Steel and Precast Concrete ContractorsView NAICS

Place of Performance

*Canada *National Capital Region (NCR), CAN

Set-Aside

NONE

Documents

(21)

Gestion et Élimination des Déchets - Projet DC5254_18

PDFsow

01-00-01 General Instructions Rev 01

PDFgeneral-instructions

Excess Soil Management Specification Rev 0

PDFsow

260217-SI-034 rev 2 - Rideau Canal Lighting System Revitalization Structural Details

PDFspecifications

01-78-00 Documents De Clôture - Archiving Drawings Instructions

PDFsow

01-74-09 Waste Management and Disposal Rev 0

PDFsow

DC5254_18 Procédures Environnementales Rev 0

PDFsow

01-33-00 Submittal Procedures Rev 0

PDFsow

Environmental Procedures Rev 0

PDFsow

00-01-07 Seals Section Rev 0 for Rideau Canal Lighting System

PDFspecifications

01-61-00 Exigences Communes Relative Aux Produits Rev 0

PDFspecifications

Selective Site Demolition Specification Rev 0

PDFspecifications

01-61-00 Common Product Requirements Rev 0

PDFspecifications

Revitalisation du Système d'Éclairage du Canal Rideau - Structural Details and Guardrail Replacement Plans

PDFspecifications

01-78-00 Closeout Submittals Record Drawings Section

PDFsow

Gestion des Souilles - Rénovation du système d'éclairage du canal Rideau - DC5254_18

PDFspecifications

02-41-13 Démolition Sélective du Site Rev 0

PDFsow

DC5254_18 Rénovation du système d'éclairage du canal Rideau - Page des Sceaux

PDFspecifications

Procédures de Soumission Rev 0 - DC5254_18

PDFsow

NCC-DC-039926-RFQ Rideau Canal Lighting Rehabilitation Project

PDFrfq

01-00-01-Instructions Générales Rev 0 0 - General Instructions for Electrical and Civil Works

PDFsow

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → National Capital Commission
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → National Capital Commission
View Agency Profile
Office AddressN/A
Contacts
Carine UwamahoroPoint of Contact

Full Description

Show more
The National Capital Commission is proceeding with a Request for quotations for the services of a contractor to fabricate and install new sections of railing along the Rideau Canal Eastern and Western Pathways where required and as per tender documents.

More opportunities from Government of Canada → National Capital Commission

Same awarding agency

NAICS: 237130
International
New Underground Electric Service System
Solicitation # NCC-CS-041053-NRFP
The National Capital Commission has issued a Negotiated Request for Proposals, solicitation number NCC-CS-041053-NRFP, for the installation of a new underground electric service system at Jacques-Cartier Park North in Gatineau, Quebec. The primary objective is to establish a permanent, higher-capacity power supply to support major events, such as Winterlude, and reduce reliance on diesel generators. The scope of work is divided into two phases: Phase 1 focuses on core infrastructure and civil works near Laurier Street, including the installation of a new Hydro-Quebec infrastructure, a 600 V electrical entrance, and low-voltage distribution for the park and Maison du Vélo. Phase 2 is an optional scope extending the distribution to secondary kiosks and additional pull manholes. The project requires the removal of existing electrical infrastructure and the installation of a main 600 V switchboard and 208 V kiosks. Contractors must adhere to strict environmental and safety standards, including the implementation of tree protection, erosion and sediment control, and excess soil management plans. All work must be completed and the contractor demobilized by Winter 2027/2028, as the site will be required for other uses starting in spring 2028. Award selection is based on a multi-stage evaluation of mandatory requirements, technical capabilities, and pricing, with the top-ranked proponent entering direct contract negotiations. Required security includes performance and labour and material payment bonds, each equal to 50 percent of the project value.
Power and Communication Line and Related Structures Construction

POSTED

9 days ago

DEADLINE

in 17 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS