Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on October 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ridgewood Estates Sewer Improvements Project and 82nd Avenue & 113th Street Water Main Improvements Project (PID 003204I & PID 006170A)

Closed
26-0652-ITB-CState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

Pinellas County Utilities is soliciting bids for two coordinated infrastructure projects located near 82nd Avenue North and 113th Street North in Florida. The Ridgewood Estates Sewer Improvements (PID 003204I) aim to reduce sanitary sewer overflows by replacing gravity sewer portions and implementing stormwater water-quality improvements via a modified bioswale and enhanced pedestrian connectivity. Simultaneously, the 82nd Avenue and 113th Street Water Main Improvements (PID 006170A) involve the open-cut replacement of approximately 680 linear feet of aging 6-inch cast iron water main, including new water services, fire hydrants, and system connections. The combined scope must be completed within 380 consecutive calendar days and includes full restoration of all disturbed roadways, sidewalks, and landscaping. The procurement follows a two-step qualification process, with bid qualifications due by October 13, 2026, and final bid submissions due by November 5, 2026. The contract will be awarded to the lowest responsive and responsible bidder based on price, financial capacity, and a proven track record of similar projects completed within the last seven years. Required bonding includes a bid bond of 5 percent of the base bid, with performance and payment bonds each set at 100 percent of the contract amount. The project establishes a 10 percent participation goal for Small Business Enterprises and requires adherence to FDOT and Pinellas County Utilities technical specifications, as well as OSHA safety guidelines for all excavations.

General Info

Bids for Pinellas County sewer and water main infrastructure improvements due November 2026.

Documents

10

82nd Ave & 113th Street Water Main Improvements Technical Specifications

PDF, High priority: read this first202 pages · specifications
High

82nd Ave and 113th Street Water Improvements - PID 006170A

PDF, High priority: read this firstspecifications
High

Appendix 4 Special Notices - Ridgewood Estates Sewer & 82nd Ave Water Main Improvements

PDF, High priority: read this first10 pages · special-notice
High

Geotechnical Engineering Services Report - Ridgewood Sewer Improvements

PDF, High priority: read this firstspecifications
High

Geotechnical Report - 86th Avenue Water Main Improvements

PDF, High priority: read this firstspecifications
High

Pricing Proposal - Ridgewood Estates Sewer & Water Main Improvements

PDF, High priority: read this first8 pages · bid-schedule
High

Ridgewood Estate Sewer Improvements - Plans

PDF, High priority: read this firstspecifications
High

Ridgewood Estates Sewer and 82nd Ave/113th St Water Main Improvements (PID 003204I & 006170A)

PDF, High priority: read this first97 pages · itb
High

Ridgewood Sewer Improvements Project - Appendix 1 Permits

PDF, High priority: read this first33 pages · specifications
High

Technical Specifications - Ridgewood Sewer Improvements (Project No. 003204I)

PDF, High priority: read this first260 pages · specifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → UTILITIES
Contacts2 people available
OfficeClearwater, FL, 33765, USA
Organization / AgencyFlorida → UTILITIES
Office AddressClearwater, FL, 33765, USA
Contacts
Curtis GossBusiness Support Specialist
Michelle JurekProcurement Analyst

Interested Companies (39)

Gibbs & RegisterWinter Garden, FL
ConstructConnectCincinnati, OH

See All 39 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Ridgewood Estates Sewer Improvements, PID 003204I: The existing gravity sewer in the vicinity of 82nd Avenue North, Ridgewood Crest, and 113th Street North was evaluated and found to have capacity deficiencies that contribute to an elevated risk of sanitary sewer overflows during heavy rainfall events. The project area has experienced repeated overflow conditions, including reported events associated with heavy rainfall from Tropical Storm Colin and Hurricane Hermine in 2016. The proposed improvements were developed to address this existing collection-system deficiency and include complementary stormwater water-quality improvements through the modified bioswale and improvements to pedestrian connectivity within the project area. 82nd Avenue & 113th Street Water Main Improvements, PID 006170A: Pinellas County Utilities is undertaking water-main replacement improvements along 82 nd Avenue and 113th Street North as part of its effort to replace aging and deteriorated water infrastructure. Within the project limits, the work includes replacement of approximately 680 linear feet of existing 6-inch cast iron water main, together with associated water services, valves, fire hydrants, system connections, and appurtenances. The improvements are intended to improve the reliability and useful life of the potable water distribution system, improve water-quality circulation, and support fire protection. The two projects were designed as separate PIDs by separate Engineers of Record but occupy overlapping or immediately adjacent construction limits near 82nd Avenue and 113th Street North. Accordingly, they are being advanced as coordinated construction scopes while retaining their separate plans, technical specifications, pay items, measurement and payment requirements, testing, documentation, and other project-specific requirements.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS