Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Department Of Agriculture was posted on April 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rip Rap Culvert Armor Installation (Haul and Placement)

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract opportunity with the Idaho Panhandle National Forest under the Department of Agriculture involves the supply, hauling, and placement of 24-inch rip rap rock. The primary objective is to armor culvert outlets and prevent erosion at discharge points located along Grouse Creek Road in Sandpoint, Idaho. Contractors must implement specific environmental safeguards to protect nearby waterways during the installation process. The project is designated as a Total Small Business Set-Aside under NAICS code 484220. Interested parties must submit their responses by the deadline of April 22, 2026.

General Info

NAICS

484220 - Specialized Freight (except Used Goods) Trucking, Local

Place of Performance

Sandpoint, ID, 83864, USA

Set-Aside

SBA

Documents

This scope was carved out of 1240BD26Q0033.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

GROUSE CREEK ROAD MAINTENANCE. IDAHO PANHANDLE NATIONAL FOREST

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Heavy Equipment Transport (ATV Delivery)Open now, due in 14 days
  • Specialized Appliance TransportOpen now, due in 13 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Idaho Panhandle National Forest
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply, haul, and place 24-inch rip rap rock to armor culvert outlets and prevent erosion at discharge points along Grouse Creek Road, with environmental safeguards near waterways.

More opportunities from Department Of Agriculture → Idaho Panhandle National Forest

Same awarding agency

NAICS: 238210
Federal
Fernan Ranger Station lift station electrical repair
Solicitation # 1240LU26Q0125
Solicitation 1240LU26Q0125 is a Request for Quotation issued by the USDA Forest Service for electrical repairs to the sewer lift station at the Fernan Ranger Station in Coeur d'Alene, Idaho. This project is a Total Small Business Set-Aside under NAICS code 238210, with a total project magnitude estimated to be under $25,000. The primary objective is to mitigate safety hazards by relocating the control panel and electrical shutoff from an underground vault to a new 4ft x 6ft x 6in above-ground concrete pad to ensure OSHA and electrical safety code compliance. The scope of work includes replacing corroded disconnect switches, circuit breakers, and distribution blocks with corrosion-resistant components, installing a moisture-proof control box housing, securing exposed cabling within waterproof conduit, and installing a low-profile LED light fixture. The contract follows a best-value award process where the government will select the highest technically rated offeror, provided the price is fair and reasonable and past performance over the last five years is acceptable. Performance is expected to be completed within 60 days after the Notice to Proceed. Contractors must comply with the Davis-Bacon Act for prevailing wages and provide personnel with required professional licensing. Required submission documents include a completed SF 1442, a priced schedule of items covering mobilization and specific repair tasks, a past performance questionnaire, and a written technical approach with equipment data sheets.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

12 days ago

DEADLINE

in 2 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS