Riprap Channel Installation & Bank Stabilization
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract for the Fresno Irrigation District involves the installation of riprap and bank stabilization for water infrastructure projects located at Big Dry Creek. The primary objective is to place riprap rock armor to prevent erosion and stabilize channel banks, utilizing heavy excavation equipment such as loaders and excavators to deliver a stabilized, riprap-lined channel bank. The project falls under NAICS code 237990 and requires strict compliance with environmental permits issued by the California Department of Fish and Wildlife and the Central Valley Flood Protection Board. The contract was posted on June 24, 2026, and is designed for subcontractors working under prime contractors to ensure the structural integrity of the district's water infrastructure.
General Info
Agency
Place of Performance
CASet-Aside
Documents
This scope was carved out of EPIMS-FRE-55366-R4.
The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.
Turnout on the Friant-Kern Canal at Big Dry Creek Project
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
