Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Turnout on the Friant-Kern Canal at Big Dry Creek Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Turnout on the Friant-Kern Canal at Big Dry Creek Project, identified by solicitation number EPIMS-FRE-55366-R4, is a water diversion facility construction project managed by the Fresno Irrigation District in Fresno County, California. The primary objective is to divert and deliver water from the Friant-Kern Canal into Big Dry Creek to facilitate groundwater recharge. The scope of work includes the construction of a new concrete turnout structure along the canal bank, the installation of a 72-inch diameter reinforced concrete underground pipeline, a new concrete outlet structure with rip rap on the bank of Big Dry Creek, and the excavation of a rip rap-lined open channel to convey water flow. The project is governed by several regulatory authorizations, including Permit No. 20050 under California Code of Regulations Title 23 and Lake or Streambed Alteration Agreement No. EPIMS-FRE-55366-R4 pursuant to Fish and Game Code section 1602. Environmental clearances have been established through a Mitigated Negative Declaration, with the California Department of Fish and Wildlife and the Central Valley Flood Protection Board both determining that the project will have no significant environmental effect within their respective jurisdictions. The work is located approximately 13 miles northeast of Fresno and east of Clovis, specifically within Township 12 South, Range 22 East, Section 20.

General Info

Fresno Irrigation District project constructing water diversion facilities for groundwater recharge in Fresno County.

Agency

California → Fresno Irrigation District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

Notice of Determination for Permit No. 20050 - Central Valley Flood Protection Board

PDFnotice-of-determination

FRE-55366 Notice of Determination for Friant Kern Canal Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fresno Irrigation District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fresno Irrigation District
Office AddressN/A
Contacts
Jennifer CallesSenior Environmental Scientist
Laurence KimuraChief Engineer

Full Description

Show more
Approval of Permit No. 20050, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To construct a new concrete turnout structure along the bank of the Friant-Kern Canal (FKC) that would divert and deliver water from the FKC into Big Dry Creek (BDC) via a 72-inch diameter reinforced concrete pipeline installed underground connected to a new concrete outlet structure with rip rap located on the bank of BDC. To excavate and construct an open channel lined with rip rap to convey water flow to BDC.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 11 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 23 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS