Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Charnock Road Elementary School Playground and Campus Exterior Upgrades

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Charnock Road Elementary School Playground and Campus Exterior Upgrades project is a comprehensive renovation of the 5.8-acre campus located in the Palms neighborhood of Los Angeles. With a budget of 11,208,254 dollars approved by the Los Angeles Unified School District Board of Education on March 12, 2024, the project focuses on replacing approximately 94,000 square feet of paving in the main and kindergarten playgrounds. The scope of work includes the installation of solar reflective coatings, new playground equipment, the removal of relocatable buildings, the creation of an outdoor learning environment, and general campus greening, landscaping, privacy fencing, and exterior building painting. Additionally, the project encompasses critical infrastructure upgrades to the sanitary sewer, storm drainage, and overall site accessibility. The project must adhere to all state, federal, and local regulations, as well as the District Standard Conditions of Approval for Construction, Upgrade, and Improvements Projects adopted in December 2023. Key operational requirements include mandatory soil sampling and testing prior to paving removal, maximum recycling of construction and demolition waste, and strict protocols for the import and export of materials. Environmental protections are prioritized through required arborist consultations for tree removal, nesting bird surveys between February and August, and immediate work stoppage if paleontological or archaeological resources, tanks, or contaminated soils are discovered. The project is designed to benefit students, staff, and the broader community under the Civic Center Act.

General Info

Replace playground paving, install solar coating, upgrade infrastructure, add landscaping and fencing, comply with LAUSD standards.

Agency

California → Los Angeles Unified School District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Los Angeles, CA

Set-Aside

NONE

Documents

(1)

Charnock Road Elementary School Playground and Campus Exterior Upgrades Project NOE 20260618

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles Unified School District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles Unified School District
Office AddressN/A
Contacts
Christy WongCEQA Project Manager

Full Description

Show more
The Project will replace approximately 94,000 square feet of paving in the main and kindergarten playgrounds with new paving. The scope of work includes solar reflective coating in playgrounds; replacement of playground equipment; relocatable building removal; installation of an outdoor learning environment; greening and landscaping throughout the Campus; privacy fencing; and exterior painting of buildings where needed. The Project will also provide infrastructure upgrades including sanitary sewer, storm drainage, and accessibility upgrades (Figure 1). The Los Angeles Unified School District Board of Education approved the Project's budget of $11,208,254 on March 12, 2024. The Project will be implemented per all applicable State, federal, and local regulations, as well as all District Standards and Specifications; such as those provided in the updated Standard Conditions of Approval for District Construction, Upgrade, and Improvements Projects (SCs) as adopted by the Board of Education in December 2023. LAUSD’s SCs, design guidelines, and best management practices are designed to be incorporated into the Project design in order to avoid or limit potential adverse impacts associated with the District’s projects. The beneficiaries of the Project include Charnock ES students, faculty, staff, families, school supporters, and the community at large who may request access to the playground pursuant to the Civic Center Act (CA Ed. Code Sections 38130 -38139).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The scope of work includes the dredging and ocean disposal of approximately 4,260 cubic yards of material, vegetation clearance, and stone rework for the revetted mole. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a price evaluation preference. Bidders must submit physical sealed envelopes by the deadline, as electronic submissions are prohibited. Required documentation includes SF 1442, the CLIN schedule, representations and certifications, and a bid guarantee. The contractor must provide key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Performance will be measured through pre- and post-dredge multi-beam surveys conducted by a third-party surveyor, and the contract includes liquidated damages of 2,297 dollars per calendar day of delay. Compliance with the Davis-Bacon Act and strict environmental and safety standards is required throughout the execution of the work.
Healy Tibbitts Builders, Inc.

POSTED

about 5 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price construction contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include demolition, clearing and grubbing, excavation, placing embankment, installing separator geotextiles, placing graded stone, and turf establishment and maintenance. Bids are due by October 19, 2026, at 10:00 a.m., with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on unit prices, provided they are reasonable and balanced. The contractor must adhere to EM 385-1-1 safety standards and the Davis-Bacon Act for prevailing wages. Performance requirements include submitting a preliminary project schedule within 15 days and an initial schedule within 42 days of the Notice to Proceed. The contract includes liquidated damages of $4,295.00 per calendar day of delay and requires the use of approved testing laboratories for quality control. A project labor agreement is not required for this acquisition.
W07V Endist New Orleans

POSTED

about 9 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237990
New
Federal
Kalispel Tribe Dike Repair- Pend Oreille County, Washington
Solicitation # 12FPC326B0016
The USDA NRCS is soliciting proposals for the repair of the Kalispel Tribe Dike in Pend Oreille County, Washington, under solicitation 12FPC326B0016. This total small business set-aside project has an estimated magnitude between $250,000 and $500,000. The scope of work includes site dewatering, erosion control, excavating and stockpiling dike soil, and the removal and resetting of a 36-inch diameter dike culvert and anti-seep collars. If the existing culvert and collars are found to be unsalvageable, the contractor must install new replacements. Final restoration involves placing nonwoven geotextile and riprap around the culvert outlet, followed by backfilling and compacting the dike to specification. The period of performance is scheduled from October 12, 2026, to November 1, 2027. Bids are due by September 21, 2026, and must be submitted via email with all required signatures and a bid guarantee. Award will be made to the responsible bidder whose proposal is most advantageous to the government, based on price and previous experience with similar projects over the last five years. The project is subject to Davis-Bacon Act prevailing wage rates and requires compliance with NRCS construction and material specifications. All work is subject to government inspection, and the contractor must maintain a rigorous quality control system, submitting inspection records within one working day of completion.
Fpac Bus Cntr-Acq Division

POSTED

about 9 hours ago

DEADLINE

in 24 minutes
View Details
NAICS: 237990
New
SLED
Entrada Way Culvert Slip-out Bank Stabilization ProjectThe County of San Mateo Department of Public Works is implementing the Entrada Way Culvert Slip-out Bank Stabilization Project to repair progressive bank failure along La Honda Creek in the unincorporated community of La Honda, California. The project aims to protect critical infrastructure, including the Entrada Way roadway, stormwater systems, and utility poles, while improving water quality and enhancing riparian habitat. The scope of work involves a biotechnical approach featuring the construction of an engineered log structure cribwall along the lower bank and vegetated soil lifts on the upper slopes. Additional technical requirements include extending the existing culvert headwall by approximately 22 linear feet, realigning the creek thalweg to its original pre-erosional position, realigning a storm drain pipe, and performing minor roadway improvements and site revegetation. The project is subject to comprehensive environmental compliance under the California Environmental Quality Act, with a Mitigated Negative Declaration filed in June 2026. Key regulatory requirements include coordination with Caltrans for transportation permits and ADA compliance, as well as adherence to California Department of Fish and Wildlife regulations regarding the Native Plant Protection Act and Lake and Streambed Alteration. Specific operational mandates include the relocation of aquatic wildlife prior to dewatering, strict concrete washout protocols to prevent stream contamination, and the maintenance of bicycle and pedestrian access throughout construction. The project area encompasses approximately 2.0 acres and is managed by the Natural Resource Manager, Julie Casagrande.
California San Mateo County Department of Public Works

POSTED

about 14 hours ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS