Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Modification of Existing Culvert Outfall along Line B downstream of Harrison Street in the City of Oakland, Alameda County, California, Zone No. 12 Project

Forecast
26 - 195State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Alameda County Flood Control and Water Conservation District is undertaking the Modification of Existing Culvert Outfall along Line B downstream of Harrison Street in the City of Oakland, California, Zone No. 12 Project. This initiative is driven by the Zone 12 Drainage Master Plan, which identified that the current 14.5 foot wide by 6 foot high reinforced concrete box culvert between Harrison Street and 26th Street lacks the capacity to handle a 100-year design storm event. The project aims to improve the underground storm pipe outfall to meet these design standards and prepare the structure for a future additional underground culvert under Harrison Street and 27th Street. The scope of work includes the installation of a 50-foot-long, 6 foot wide by 6 foot high reinforced concrete box culvert bypass beneath the sidewalk adjacent to the existing structure. Technical requirements involve the removal of 14 linear feet and 10 cubic yards of the existing concrete channel wall on the western side, the installation of a warped concrete wing wall conformed to the existing channel wall, and the removal and reconstruction of approximately 128 square feet of the existing concrete channel apron. This project is classified under NAICS code 237990 and has been granted a Notice of Exemption based on California Fish and Game Code Section 711.4 and Public Resources Code Section 21152 due to the minor nature of the alterations.

General Info

Install 6x6 ft concrete culvert to upgrade outfall capacity for 100-year storm, expand drainage per Zone 12 plan.

Agency

California → Alameda County Flood Control and Water Conservation District

Place of Performance

Oakland, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Alameda County Flood Control and Water Conservation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Alameda County Flood Control and Water Conservation District
Office AddressN/A
Contacts
Moses TsangDeputy Director

Full Description

Show more
The Alameda County Flood Control and Water Conservation District (District), Zone 12 Drainage Master Plan, determined that the existing underground 14.5’ wide x 6’ high reinforced concrete culvert box (RCB) along Line B between Harrison Street and 26th Street is under capacity associated with the 100-year design storm event. The District plans to modify the existing RCB outfall structure to accommodate an additional underground RCB in the near future under Harrison Street and 27th Street. The outfall modification project consists of installing an approximately 50-foot-long, 6’ wide x 6’ high RCB bypass beneath the sidewalk adjacent to the existing RCB. Approximately 14 linear feet and 10 cubic yards of the existing concrete channel wall on the western side of the existing RCB outfall will be removed to accommodate the new RCB outfall. A warped concrete wing wall will also be installed and conformed to the existing channel wall. A total of approximately 128 square feet of the existing concrete channel apron will be removed and reconstructed to accommodate this additional structure. The purpose of the project is to improve the underground storm pipe outfall to meet the 100-year design storm event.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 19 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 20 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 20 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS