North Coast Wildlife Area Facilities Maintenance Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The North Coast Wildlife Area Facilities Maintenance Project involves infrastructure upgrades at three key sites managed by the California Department of Fish and Wildlife: Lake Earl Wildlife Area, the Tolowa Visitor Center, and Pebble Beach Staircase. At Lake Earl, four aging water control structures will be replaced in-kind with new culverts and pre-cast concrete risers under recontoured roads, with minimal earthwork confined to existing trails and ditches. A new water crossing will be constructed along a poorly drained two-track road using Class 2 base rock elevated above grade to maintain natural water flow without encroaching on wetlands. To protect sensitive dune habitats and the breeding population of western snowy plovers, boulder barriers with integrated signage and a locking gate will be installed at two beach access points, accompanied by educational kiosks that recognize the cultural significance of the area to the Tolowa Dee-Ni’ Nation. Construction staging will occur in already disturbed areas, and any vegetation removal will avoid identified rare plant species, with no historic or tribal resources found in the work zones. At the Tolowa Visitor Center, the existing pump and filtration system supplying potable water will be replaced without any ground disturbance, maintaining the same service capacity within the existing well casing and concrete pad. At Pebble Beach Staircase, improvements include replacing the concrete access at the top of the stairs, installing a new concrete overlay, adding landings at both ends, and repairing the railing. Additional enhancements involve upgrading fencing along the bluff edge, marking ADA-compliant parking, replacing a light post, and renewing interpretive panels. While some temporary disturbance will occur to Wolf’s evening primrose—a rare plant listed as 1B.1—the impacts will be offset by invasive plant removal and native plant seeding across approximately 1500 square feet of adjacent coastal bluff habitat, alongside fence improvements to reduce erosion and human disturbance. Cultural resources assessments confirmed no historic resources of significance, and coordination with the Tolowa Dee-Ni’ Nation has informed the placement of interpretive signage and cultural monitoring protocols at the site. All work will proceed using existing roads and parking areas for access and staging.

General Info

Replace culverts, water systems, and stairs; protect wildlife and cultural sites with minimal disturbance and native habitat restoration.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Crescent City, CA

Set-Aside

NONE

Documents

(1)

LEWA North Coast Wildlife Area Facilities Maintenance Project CEQA Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts1 person available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
Shawn FreszNorthern Region Lands and Wildlife Program Supervisor

Full Description

Show more
The project includes infrastructure improvements at three discrete locations owned and managed by the California Department of Fish and Wildlife (“CDFW”): ? Lake Earl Wildlife Area – Includes replacement of four existing water control structures (“WCS”) or culverts (wooden headwalls and/or corrugated metal pipelines with risers), construction of one water crossing along a poorly drained two-track dirt trail/road, and installation of boulder barriers and signage at two beach access points to deter unauthorized motor vehicle use within sensitive dune habitats. o Culvert Replacement - Each culvert will be replaced in-kind (same location, same purpose) with a new culvert and pre-cast concrete riser located under a recontoured road/trail. Earthwork will largely be limited to the existing road/trail footprint where the structures are currently located, with some minor encroachment into ditches to remove sediment and debris at the inlet/outlet, and to stabilize ditch banks. o Water Crossing - A water crossing will be located along approximately 40 linear feet of a 6-foot wide two-track dirt road that is currently a barrier for water conveyance across a wetland. The crossing will be comprised of Class 2 base rock, elevated approximately 6-inches above grade, to allow water to flow through/under the road. Crushed gravel will extend north and south from the crossing for 20 feet at a 1% slope to gradually match the crossing elevation to the existing road elevation. Improvements will be limited to the prism of the existing road and will not extend into the adjacent wetland habitats. o Beach Access Boulder Barriers - Boulders and associated signage will be placed at two access points along the beach to deter the use of motor vehicles in areas where a breeding population of western snowy plover (Anarhynchus nivosus nivosus) occur. One series of boulders will be placed across a beach access point on the south side of Ramey Street. A second series of boulders will be placed at a beach access point on the west end of Stukey Street. Several kiosks will be placed along the boulder barriers in two locations, and will include signage describing allowed uses, the use of the beach by native wildlife, and the importance of the area to the Tolowa Dee-Ni' Nation. A 14-foot-wide locking gate will also be integrated into the boulder barrier to provide limited maintenance vehicle access along the beach. Staging areas for work at LEWA will be located in disturbed/weedy ruderal areas adjacent to a barn east and south of the most northern water control structure (WCS 1), on the north and south side of the exiting two-tract road southwest of WCS 3 and 4, and adjacent to the boulder placement areas. Construction access will be provided by existing roads. Work will require some vegetation removal at the culvert replacement locations; rare plants identified during special-status plant surveys by CDFW (2026) will be avoided. A cultural resources assessment of the project area identified no known historic or tribal resources in work areas (Helix 2025). ? Tolowa Visitor Center – Includes replacement of an existing pump and filtration system that provides potable water to the Tolowa Visitor Center. Work to replace the pump will be limited to the area associated with the well casing and surrounding concrete pad (no ground disturbance is proposed). The pump will be sized to provide the same service (capacity) as the existing pump. ? Pebble Beach Staircase – Includes improving the Pebble Beach staircase and associated public access amenities along South Pebble Beach Drive in Crescent City. Staircase improvements will include removing/replacing the concrete access at the top of the stairs; placing a new concrete overlay on the existing staircase; installing landings at the bottom of the north and south stairs; and repairing/replacing the railing along the staircase. The project will make other minor improvements to public access amenities at the site, including improving the fencing that demarcates the edge of the bluff; marking parking spaces and adding/signing an ADA parking location in the parking lot; replacing the existing light post and light adjacent to the parking area; and replacing interpretive panels. Staging and access will be provided at the existing parking area. Work will require some vegetation removal along the sides of the staircase; rare plants identified during special-status plant surveys by CDFW will generally be avoided, with the exception of several Wolf’s evening primrose (Oenothera wolfii, California Rare Plant Rank: 1B.1) that will be temporarily disturbed by work at the staircase (CDFW 2026). Impacts to native coastal bluff habitat, including Wolf’s evening primrose, will be offset by invasive plant removal and native plant seeding along about 1500 square feet of coastal bluff adjacent to the staircase, and by improving the fence between the bluff edge and parking lot to both allow for focused management of native coastal bluff species and to minimize ongoing disturbance and erosion of the bluff proximate to the staircase. A cultural resources assessment completed in 2025 identified no known historic resources (including the staircase, recommended as not eligible for listing). CDFW has also coordinated with the Tolowa Dee-Ni' Nation on interpretive signage and cultural monitoring at this location.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 11 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 14 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated construction magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include site access construction, demolition, clearing and grubbing, excavation, and the placement of embankment, geotextiles, and stone, as well as turf establishment and maintenance. Bids are due by 10:00 a.m. on October 19, 2026, with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on the provided unit prices, provided the bid is reasonable and balanced. The contractor must adhere to USACE EM 385-1-1 (2024) safety standards and FHWA MUTCD guidelines. Notable contract requirements include the use of approved testing laboratories, compliance with the Davis-Bacon Act, and the provision of performance and payment bonds. Liquidated damages for delays are set at $4,295.00 per calendar day. Performance begins following the approval of an Accident Prevention Plan and Contractor Quality Control Plan, with a preliminary project schedule due within 15 days of the Notice to Proceed.
W07V Endist New Orleans

POSTED

about 15 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS