Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Electric Vehicle Transit Yard Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Mariposa County plans to develop a transit yard on a 1.54-acre site east of State Route 49, featuring a solar canopy and electric vehicle charging infrastructure to support zero-emission vehicle operations. The solar canopy, elevated approximately 14 feet above ground, will cover paved areas to provide shelter for vehicles while maintaining access and operational space beneath. Photovoltaic panels mounted on the canopy will generate electricity, which will be stored in on-site batteries and used to power EV charging stations and other facility needs, with design flexibility to accommodate future expansion of the zero-emission fleet. The project includes essential electrical systems such as conduits and connections to route solar-generated power efficiently, ensuring reliable energy delivery for daily operations. In addition to the solar and charging components, the project will introduce a new driveway connecting to Frank Wilson Road and install storm drain facilities to manage runoff and meet environmental standards. The site will serve as a dedicated transit yard for the County’s vehicle fleet, enhancing sustainability and reducing reliance on fossil fuels. The initiative is part of broader efforts to modernize public infrastructure and align with clean energy goals. Primary contact for inquiries is Matiel Holloway, Senior Civil Engineer, with project management support from Tsui Li of FCS International. The opportunity was posted on June 18, 2026, and is located in the 95338 zip code area of California.

General Info

Mariposa County to build solar canopy and EV charging transit yard on 1.54-acre site east of SR-49.

Agency

California → Mariposa County

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Frank Wilson Road and Lemee Lane, CA, 95338

Set-Aside

NONE

Documents

(10)

Notice of Availability for Electric Vehicle Transit Yard Project IS/MND

PDFspecial-notice

Mariposa Zero Emission Transit Yard Project Geotechnical Report Draft April 2025

PDFgeotechnical-report

Mariposa County Electric Vehicle Transit Yard Project Summary Form

PDFenvironmental-summary

41990039 Mariposa EV Transit Yard Project Draft Initial Study/Mitigated Negative Declaration

PDFismnd

Appendix C - Cultural Resources Assessment for Electric Vehicle Transit Yard Project

PDFother

Appendix B - Biological Resources Supporting Information for Electric Vehicle Transit Yard Project

PDFsupporting-document

Appendix A - Air Quality, GHG, Energy Supporting Information for Electric Vehicle Transit Yard Project

PDFsupporting-document

Appendix F - Noise Calculations for Electric Vehicle Transit Yard Project

PDFsupporting-document

Appendix E - Phase I Environmental Site Assessment for Lemee Lane Property

PDFphase-i-esa

Notice of Completion - Electric Vehicle Transit Yard Project

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Mariposa County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Mariposa County
Office AddressN/A
Contacts
Matiel HollowaySenior Civil Engineer

Interested Companies (1)

Show more
FirstCarbon Solutions
Walnut Creek, CA

Full Description

Show more
The Mariposa County Public Works Department proposes to construct a transit yard featuring a solar canopy and electric vehicle (EV) charging stations on the 1.54-acre project site, located east of SR- 49. The charging infrastructure would be designed to accommodate the operational needs of the County and would allow for future expansion of Zero-Emission Vehicles (ZEVs). The project includes the installation of a solar canopy consisting of elevated structures designed to support photovoltaic (PV) panels mounted above paved surfaces. The canopy would be approximately 14 feet high and configured to provide overhead coverage for vehicles while allowing circulation, parking, and operational use of the underlying areas. Electrical equipment such as conduits and connections would be installed to convey electricity generated by the PV panels to on-site electrical systems. The project would include batteries for power storage. The electricity generated by the solar canopies would support on-site operations, including EV charging and other facility energy demands. Includes a new driveway connecting to Frank Wilson Road, and new storm drain facilities.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 8 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 20 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS