Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Electric Vehicle Transit Yard Project

Forecast
forecast_24325776-ebe3-4641-93d8-256123ca1a66State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Mariposa County plans to develop a transit yard on a 1.54-acre site east of State Route 49, featuring a solar canopy and electric vehicle charging infrastructure to support zero-emission vehicle operations. The solar canopy, elevated approximately 14 feet above ground, will cover paved areas to provide shelter for vehicles while maintaining access and operational space beneath. Photovoltaic panels mounted on the canopy will generate electricity, which will be stored in on-site batteries and used to power EV charging stations and other facility needs, with design flexibility to accommodate future expansion of the zero-emission fleet. The project includes essential electrical systems such as conduits and connections to route solar-generated power efficiently, ensuring reliable energy delivery for daily operations. In addition to the solar and charging components, the project will introduce a new driveway connecting to Frank Wilson Road and install storm drain facilities to manage runoff and meet environmental standards. The site will serve as a dedicated transit yard for the County’s vehicle fleet, enhancing sustainability and reducing reliance on fossil fuels. The initiative is part of broader efforts to modernize public infrastructure and align with clean energy goals. Primary contact for inquiries is Matiel Holloway, Senior Civil Engineer, with project management support from Tsui Li of FCS International. The opportunity was posted on June 18, 2026, and is located in the 95338 zip code area of California.

General Info

Mariposa County to build solar canopy and EV charging transit yard on 1.54-acre site east of SR-49.

Agency

California → Mariposa County

Place of Performance

Frank Wilson Road and Lemee Lane, CA, 95338

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Mariposa County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Mariposa County
Office AddressN/A
Contacts
Matiel HollowaySenior Civil Engineer

Interested Companies (1)

FirstCarbon SolutionsIrvine, California

Full Description

Show more
The Mariposa County Public Works Department proposes to construct a transit yard featuring a solar canopy and electric vehicle (EV) charging stations on the 1.54-acre project site, located east of SR- 49. The charging infrastructure would be designed to accommodate the operational needs of the County and would allow for future expansion of Zero-Emission Vehicles (ZEVs). The project includes the installation of a solar canopy consisting of elevated structures designed to support photovoltaic (PV) panels mounted above paved surfaces. The canopy would be approximately 14 feet high and configured to provide overhead coverage for vehicles while allowing circulation, parking, and operational use of the underlying areas. Electrical equipment such as conduits and connections would be installed to convey electricity generated by the PV panels to on-site electrical systems. The project would include batteries for power storage. The electricity generated by the solar canopies would support on-site operations, including EV charging and other facility energy demands. Includes a new driveway connecting to Frank Wilson Road, and new storm drain facilities.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 19 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 20 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 20 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS