Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Russian Gulch Combo Building Accessibility Upgrades

Forecast
13618_Russian Gulch ADA Comfort Station_dNOE_06State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project at Russian Gulch will replace an existing non-ADA compliant comfort station with a new, accessible facility of similar size to enhance visitor accessibility, particularly for individuals with disabilities. The new structure will be approximately 700 square feet, featuring batten board siding and clerestory windows, and will include three showers and four toilet stalls compliant with current accessibility codes. The existing combo building will be demolished, and the site will be reconfigured to include a 300-square-foot accessible concrete parking space, a 15-minute aggregate base parking area, and concrete flatwork surrounding the building. The campground road in front of the restroom will be repaved for approximately 1,700 square feet to ensure safe and level access. All necessary utility connections are located nearby, minimizing installation complexity. A geotechnical investigation will be conducted with two 6-inch diameter borings, each 15 to 25 feet deep, using a truck-mounted auger drill rig. These borings will be properly backfilled with neat cement grout to ensure site stability and safety. The entire project is designed to meet modern accessibility standards while preserving the functionality and aesthetic of the existing facility. The California Department of Parks and Recreation is managing the project, with Brad Michalk, Statewide CEQA Coordinator, listed as the primary point of contact. The project is forecasted for posting on June 17, 2026, with the place of performance located at Russian Gulch State Park, zip code 95460, California.

General Info

Replace non-ADA comfort station with accessible 700-sq-ft facility, new parking, repaved road, and utility connections at Russian Gulch State Park.

Agency

California Parks and Recreation, Department of

Place of Performance

State Highway 1 and Russian Gulch State Park Road, CA, 95460

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Brad MichalkStatewide CEQA Coordinator

Full Description

Show more
This project will replace an existing non-ADA compliant comfort station with a new comfort station building of similar size, to improve access for visitors with disabilities. Specifically, the project will: Demolish the existing combo building and replace with code compliant structure with 3 showers and 4 toilet stalls. Provide concrete accessible parking space, aggregate base 15-minute parking space, and repave the campground road in front of the restroom. The geotechnical investigation will consist of 2 borings. The borings will be 6 inches in diameter and approximately 15 to 25 feet deep using a truck-mounted drill rig equipped with an auger. The borings will be backfilled with neat cement grout. After demolishing the existing combo building, the project will construct an approximately 700 SF structure with batten board siding and clerestory windows. A concrete accessible parking spot will be constructed (approx. 300 SF), along with concrete flatwork around the building. All utility connections are in immediate proximity to the proposed building. The asphalt in front of the building will be repaved (approx. 1,700 SF).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 19 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 20 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 20 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS