Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

San Luis Obispo Creek at San Luis Bay Drive near Avila Beach Stream Gage Project No. 455R277613/ ED No. 26-0081

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project entails the installation of a stream gage along San Luis Obispo Creek near Avila Beach, specifically in the vicinity of San Luis Bay Drive Bridge No. 3, to monitor water levels and conditions. The system will comprise both bridge-mounted and bank-mounted components, with the bridge-mounted sensors—including a non-contact radar stage sensor and a small wire-weight reference gage—securely fastened to the existing bridge railing without any structural modifications or drilling. On the south bank of the creek, near the northwest corner of San Luis Bay Drive and Avila Beach Drive, a gage shelter will be established, housing additional equipment such as a pressure transducer and a water temperature sensor. These devices will be routed along existing rock slope protection and anchored in the creek bed using drive pins and rock anchors, with all in-channel work performed manually using hand tools to minimize environmental impact. Limited excavation above the ordinary high-water mark and minor vegetation trimming are permitted, but no tree removal or habitat alteration is planned. All vehicle parking and equipment staging will occur within previously disturbed areas or on existing paved surfaces to avoid additional land disruption.

General Info

Install stream gage near Avila Beach Bridge with bridge and bank sensors, no drilling, minimal environmental impact.

Agency

California → San Luis Obispo County

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

San Luis Obispo, CA

Set-Aside

NONE

Documents

(1)

San Luis Obispo Creek Stream Gage Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Luis Obispo County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Luis Obispo County
Office AddressN/A
Contacts
Kate SheaEnvironmental Specialist

Full Description

Show more
The proposed project involves the installation of a stream gage along San Luis Obispo Creek near Avila Beach in San Luis Obispo County. The stream gage will include both bridge-mounted and bank-mounted components on and in the immediate vicinity of San Luis Bay Drive Bridge No. 3. A non-contact radar stage sensor and a co-located small wire-weight reference gage will be installed on the existing bridge structure. Bridge-mounted components will be secured to the bridge railing to avoid drilling into or otherwise modifying the bridge. The bank-mounted installation will consist of a gage shelter located along the top of the left (south) bank of San Luis Obispo Creek, near the northwestern corner of the intersection of San Luis Bay Drive and Avila Beach Drive. Additional equipment will include a pressure transducer and a water temperature sensor, which will be routed along existing rock slope protection on the bank and placed within the creek bed. The equipment will be secured using drive pins and rock anchors. In-channel work is expected to be completed using hand tools. Limited excavation above the ordinary high-water mark is proposed, along with minor vegetation trimming. No tree removal or habitat alteration is proposed as part of the project. Vehicle parking and staging of supplies and equipment will occur within previously disturbed areas or on existing paved surfaces.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 22 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS