San Luis Obispo Creek at San Luis Bay Drive near Avila Beach Stream Gage Project No. 455R277613/ ED No. 26-0081

Forecast
ED No. 26-0081State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project entails the installation of a stream gage along San Luis Obispo Creek near Avila Beach, specifically in the vicinity of San Luis Bay Drive Bridge No. 3, to monitor water levels and conditions. The system will comprise both bridge-mounted and bank-mounted components, with the bridge-mounted sensors—including a non-contact radar stage sensor and a small wire-weight reference gage—securely fastened to the existing bridge railing without any structural modifications or drilling. On the south bank of the creek, near the northwest corner of San Luis Bay Drive and Avila Beach Drive, a gage shelter will be established, housing additional equipment such as a pressure transducer and a water temperature sensor. These devices will be routed along existing rock slope protection and anchored in the creek bed using drive pins and rock anchors, with all in-channel work performed manually using hand tools to minimize environmental impact. Limited excavation above the ordinary high-water mark and minor vegetation trimming are permitted, but no tree removal or habitat alteration is planned. All vehicle parking and equipment staging will occur within previously disturbed areas or on existing paved surfaces to avoid additional land disruption.

General Info

Install stream gage near Avila Beach Bridge with bridge and bank sensors, no drilling, minimal environmental impact.

Agency

California → San Luis Obispo County

Place of Performance

San Luis Obispo, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Luis Obispo County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Luis Obispo County
Office AddressN/A
Contacts
Kate SheaEnvironmental Specialist

Full Description

Show more
The proposed project involves the installation of a stream gage along San Luis Obispo Creek near Avila Beach in San Luis Obispo County. The stream gage will include both bridge-mounted and bank-mounted components on and in the immediate vicinity of San Luis Bay Drive Bridge No. 3. A non-contact radar stage sensor and a co-located small wire-weight reference gage will be installed on the existing bridge structure. Bridge-mounted components will be secured to the bridge railing to avoid drilling into or otherwise modifying the bridge. The bank-mounted installation will consist of a gage shelter located along the top of the left (south) bank of San Luis Obispo Creek, near the northwestern corner of the intersection of San Luis Bay Drive and Avila Beach Drive. Additional equipment will include a pressure transducer and a water temperature sensor, which will be routed along existing rock slope protection on the bank and placed within the creek bed. The equipment will be secured using drive pins and rock anchors. In-channel work is expected to be completed using hand tools. Limited excavation above the ordinary high-water mark is proposed, along with minor vegetation trimming. No tree removal or habitat alteration is proposed as part of the project. Vehicle parking and staging of supplies and equipment will occur within previously disturbed areas or on existing paved surfaces.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 19 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 20 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 21 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award