Ruddy Creek Pump Station Project

Forecast
BUT-57235-R2State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ruddy Creek Pump Station project, managed by the Sewerage Commission-Oroville Region, involves the construction of a new pump station and discharge line in Butte County, California. Under Streambed Alteration Agreement Amendment EPIMS Notification Number BUT-57235-R2 and section 1602 of the Fish and Game Code, the project requires open trenching of Ruddy Creek to install a 10-inch sanitary sewer force main discharge line approximately 6.5 feet below the creek bed. The line will connect to existing manhole MH-W001 on State Route 162, after which the trench will be backfilled and topped with gravel. The California Department of Fish and Wildlife has issued a Notice of Determination stating that the project will not have a significant environmental effect within its jurisdiction, provided that specific mitigation measures are met. These requirements include the removal of up to six oak trees and the strict implementation of an Oak Mitigation Plan. The project is located at coordinates 39.497910, -121.598866, on Assessor's Parcel Number 030-221-043, with Mikah Salsi serving as the primary contact for the lead agency.

General Info

Oroville Sewerage Commission to build pump station, cross Ruddy Creek with force main, remove six oaks, follow mitigation plan.

Agency

California → Oroville Sewerage Commission

Place of Performance

Oroville, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Oroville Sewerage Commission
Contacts2 people available
OfficeN/A
Organization / Agency
California → Oroville Sewerage Commission
Office AddressN/A
Contacts
Samantha MorfordEnvironmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement Amendment EPIMS Notification Number BUT-57235-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Sewerage Commission-Oroville Region. The project involves activities associated with the construction of a new pump station and discharge line which will connect to an existing manhole (MH-W001) on State Route 162. Open trenching of Ruddy Creek will be required in order to install a 10-inch sanitary sewer force main discharge line approximately 6.5 feet under the bed of the creek. Once the discharge line is placed, the trench will be backfilled, and gravel will be placed over the crossing. This amendment includes the removal of up to six (6) oak trees and the implementation of an Oak Mitigation Plan.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 19 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 20 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 21 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS