Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Flock Safety Automated License Plate Reading (ALPR) Camera Installation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Flock Safety Automated License Plate Reading (ALPR) Camera Installation Project is an initiative by the City of Visalia Police Department to enhance public safety and assist law enforcement in identifying vehicles linked to criminal activity. The project involves the installation of multiple camera units within the public right-of-way across various locations in Visalia, California, including sites at Mooney and Walnut, East Houston Avenue and McAuliff, Dinuba Boulevard and West Riggin Avenue, and Highway 198 at Highway 99. Each installation consists of a camera unit, a solar panel, and a new breakaway support pole with a concrete foundation. The project is classified as the installation of small new accessory structures and qualifies for a Class 3 Categorical Exemption under CEQA Guidelines Section 15303(e) due to its minimal impact and lack of substantial grading or roadway expansion. Administrative oversight is managed by Captain Andrew Swarthout of the City of Visalia Police Department. While the contract with Flock was dated March 31, 2023, the project is listed as a forecast with a posted date of June 15, 2026, under NAICS code 237990.

General Info

Visalia installs solar-powered ALPR cameras in public right-of-way to aid police with real-time license plate data for crime prevention.

Agency

California → City of Visalia

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

9 intersections in Visalia, Visalia, CA, 93277

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Flock Safety ALPR Camera Installation Project

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Visalia
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Visalia
Office AddressN/A
Contacts

Full Description

Show more
The project consists of the installation of a Flock Safety automated license plate reading (ALPR) camera on behalf of the Visalia Police Department. The installation includes a new breakaway support pole with concrete foundation, solar panel, and camera unit installed within public right-of-way. The purpose of the installation is to assist law enforcement in identifying vehicles associated with criminal activity. The beneficiaries of the project include law enforcement and the public at large, as the installation supports public safety objectives within the City of Visalia.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS