Sunny Hills High School Field Improvements Project

Forecast
2026031295State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sunny Hills High School Field Improvements Project, managed by the Fullerton Joint Union High School District, involves a comprehensive overhaul of athletic facilities located at 1801 Lancer Way in Fullerton, California. The scope of work includes the demolition and removal of existing track and field facilities, associated landscaping, hardscape, and infrastructure such as the storage building, fencing, and the current storm drain system and catch basin. Following demolition, the project will feature the construction of a new synthetic track and turf field, upgraded event areas for high jump, long/triple jump, discus, and shot put, and the installation of new sports equipment and striping. Additionally, the project includes the relocation of softball batting cages and the implementation of a subsurface stormwater infiltration system. The project was approved on June 9, 2026, under a Negative Declaration pursuant to CEQA, determining that there would be no significant environmental impact. As a condition of approval, the district has mandated specific mitigation measures and adopted a mitigation reporting and monitoring plan. Administrative oversight is led by Vince Madsen, the Senior Director of Facilities, M&O and Transportation. The project is categorized under NAICS code 237990 and is identified by solicitation number 2026031295.

General Info

Fullerton Joint Union High School District will overhaul Sunny Hills High athletic field facilities.

Agency

California → Fullerton Joint Union High School District

Place of Performance

Bastanchury Road and Lancer Way, Fullerton, CA, 92833

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fullerton Joint Union High School District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Fullerton Joint Union High School District
Office AddressN/A
Contacts
Vince MadsenSenior Director of Facilities, M&O and Transportation

Full Description

Show more
The proposed project would remove existing track and field facilities, associated landscaping and hardscape, infrastructure including the storage building, storm drain system, catch basin, and fencing, and relocate the existing batting cages. The proposed project would then construct a new synthetic track and turf field, upgraded track and field event areas (including long/triple jump, high jump, discus, and shot put facilities), new sports equipment and striping, relocated softball batting cages, and a subsurface stormwater infiltration system.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 20 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 21 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 21 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS