Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Sunny Hills High School Field Improvements Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sunny Hills High School Field Improvements Project, managed by the Fullerton Joint Union High School District, involves a comprehensive overhaul of athletic facilities located at 1801 Lancer Way in Fullerton, California. The scope of work includes the demolition and removal of existing track and field facilities, associated landscaping, hardscape, and infrastructure such as the storage building, fencing, and the current storm drain system and catch basin. Following demolition, the project will feature the construction of a new synthetic track and turf field, upgraded event areas for high jump, long/triple jump, discus, and shot put, and the installation of new sports equipment and striping. Additionally, the project includes the relocation of softball batting cages and the implementation of a subsurface stormwater infiltration system. The project was approved on June 9, 2026, under a Negative Declaration pursuant to CEQA, determining that there would be no significant environmental impact. As a condition of approval, the district has mandated specific mitigation measures and adopted a mitigation reporting and monitoring plan. Administrative oversight is led by Vince Madsen, the Senior Director of Facilities, M&O and Transportation. The project is categorized under NAICS code 237990 and is identified by solicitation number 2026031295.

General Info

Fullerton Joint Union High School District will overhaul Sunny Hills High athletic field facilities.

Agency

California → Fullerton Joint Union High School District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Bastanchury Road and Lancer Way, Fullerton, CA, 92833

Set-Aside

NONE

Documents

(1)

Notice of Determination for Sunny Hills HS Field Improvements Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fullerton Joint Union High School District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Fullerton Joint Union High School District
Office AddressN/A
Contacts
Vince MadsenSenior Director of Facilities, M&O and Transportation

Full Description

Show more
The proposed project would remove existing track and field facilities, associated landscaping and hardscape, infrastructure including the storage building, storm drain system, catch basin, and fencing, and relocate the existing batting cages. The proposed project would then construct a new synthetic track and turf field, upgraded track and field event areas (including long/triple jump, high jump, discus, and shot put facilities), new sports equipment and striping, relocated softball batting cages, and a subsurface stormwater infiltration system.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS