Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Mokelumne River Confluence Multi-Benefit Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Mokelumne River Confluence Multi-Benefit Project, managed by Reclamation District No. 38, focuses on the rehabilitation of approximately 4 miles of levee system on Staten Island in San Joaquin County, California. The primary objective is to bring the levee section from Station 822+00 to 1038+00 up to the Delta Specific PL 84-99 Standard. Landside operations include raising the levee crown to ensure sufficient freeboard above the 100-year flood elevation, stabilizing slopes through the construction of a toe berm, and building a setback levee from Station 857+00 to 864+00. Additional infrastructure work involves the modification of eight irrigation siphons and the construction of a 16-foot-wide all-weather levee crest patrol road. Waterside efforts focus on creating approximately 1 acre of Delta Levee Waterside Habitat by excavating the existing levee at the setback location to establish a habitat bench above Mean Lower Low Water, which will be planted with native riparian species and subject to ongoing monitoring. The project is compliant with CEQA and NEPA, with a Mitigated Negative Declaration indicating no significant environmental effects provided mitigation measures are followed. Key requirements include strict adherence to hazardous material labeling regulations and specific protocols for the inadvertent discovery of human remains or tribal cultural resources, including a 100-foot work stoppage buffer and consultation with the Confederated Villages of Lisjan Nation. Construction is planned for 2027-2028.

General Info

Reclamation District 38 will rehabilitate four miles of levee in San Joaquin County.

Place of Performance

Staten Island Road and West Walnut Grove Road, CA, 95690

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Reclamation District No. 38 - Staten Island
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Martin BerberSenior Project Engineer

Interested Companies (1)

Wagner & BonsignoreSacramento, CA

Full Description

Show more
The purpose of the Mokelumne River Confluence Multi-Benefit Project is to rehabilitate the levee section from Station 822+00 – 1038+00 to the Delta Specific PL 84-99 Standard and create waterside habitat. Landside work includes raising the levee crown to achieve sufficient freeboard above the 100-year flood elevation and stabilizing the landside slope through the construction of a toe berm. Additionally, a setback levee will be constructed from Station 857+00 – 864+00. Waterside work includes excavation of the existing levee at the setback levee, to construct a habitat bench above Mean Lower Low Water. The habitat bench and setback levee waterside slope will be planted with native riparian species, creating approximately 1 acre of Delta Levee Waterside Habitat. Plantings will be monitored and maintained to ensure success criteria are met.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 20 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 21 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 21 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS