San Jacinto Valley Master Drainage Plan and San Jacinto Regional Area Drainage Plan Amendment
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Line E is a planned regional drainage channel within the San Jacinto Valley Master Drainage Plan, designed to serve a tributary area of approximately 1,870 acres by managing stormwater runoff and reducing flood risk without removing properties from the 100-year floodplain of the San Jacinto River; instead, floodplain compliance will be achieved through property elevation. The facility is configured as an earthen-lined channel that begins upstream and north of the San Jacinto Reservoir east of Sanderson Avenue, trends west across Sanderson Avenue, and continues parallel to and south of the Metropolitan Water District’s Casa Loma Barrel No. 1 easement south of Ramona Expressway. An original alignment detailed in the 2013 certified Environmental Impact Report was subsequently revised through an addendum to avoid sensitive environmental resources and critical water and wastewater infrastructure that would impede construction. The revised alignment was evaluated under the California Environmental Quality Act, and on June 2, 2026, the City of San Jacinto determined that the modification does not introduce new or more significant environmental impacts than those already analyzed in the original EIR, thus eliminating the need for additional environmental review. The City, through its Community Development Director, maintains oversight of the project, with public contact information and regulatory documentation accessible via the State Clearinghouse number 2009041077.
General Info
Agency
NAICS
Place of Performance
SANDERSON AVENUE AND RAMONA EXPRESSWAY, San Jacinto, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code