San Jacinto Valley Master Drainage Plan and San Jacinto Regional Area Drainage Plan Amendment

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of San Jacinto is implementing the Revision to Line E of the San Jacinto Valley Master Drainage Plan and San Jacinto Regional Area Drainage Plan Amendment. This project involves the construction of the Line E facility, an earthen lined channel designed to serve a tributary area of approximately 1,870 acres. The facility extends north and upstream from the San Jacinto Reservoir east of Sanderson Avenue, turning west across Sanderson Avenue and continuing parallel to and south of the Metropolitan Water District of Southern California's Casa Loma Barrel No. 1 easement south of Ramona Expressway. The project area is generally bounded by Ramona Expressway to the north, Ramona Boulevard to the east, Cottonwood Avenue to the south, and Byrd Street to the west. To ensure constructability and protect sensitive environmental resources and critical water and wastewater infrastructure, an Addendum to the original Environmental Impact Report was prepared to modify the facility's alignment. On June 2, 2026, the City of San Jacinto determined that this Addendum adequately addressed the revisions without requiring further environmental review, as the changes would not result in new or more significant environmental impacts. A Notice of Determination was subsequently issued on June 8, 2026, certifying the project's compliance with CEQA guidelines. The project is managed by the City of San Jacinto Planning Department under NAICS code 237990.

General Info

San Jacinto is constructing the Line E earthen channel for regional drainage management.

Agency

California → City of San Jacinto

Place of Performance

SANDERSON AVENUE AND RAMONA EXPRESSWAY, San Jacinto, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Jacinto
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of San Jacinto
Office AddressN/A
Contacts
KEVIN WHITECOMMUNITY DEVELOPMENT DIRECTOR

Full Description

Show more
Line E facility is a planned regional drainage facility within the SJV-MDP that would provide a service to an approximately 1,870-acre tributary area. Construction of Line E does not remove properties from the 100-Year floodplain of the San Jacinto River; this will be accomplished by elevating them from the San Jacinto River Floodplain. The Line E facility as identified in the SJV-MDP and evaluated in the SJV-MDP EIR is an earthen lined channel, extending upstream and north from the San Jacinto Reservoir east of Sanderson Avenue, turning west crossing Sanderson Avenue continuing west parallel to and south of the Metropolitan Water District of Southern California’s (Metropolitan’s) Casa Loma Barrel No. 1 easement south of Ramona Expressway. The City of San Jacinto prepared an Environmental Impact Report (EIR) for the San Jacinto Valley Master Drainage Plan (SJV-MDP) and the San Jacinto Regional Area Drainage Plan (ADP) Amendment which was certified by the San Jacinto City Council on January 14, 2013. (State Clearinghouse No. 2009041077). An Addendum to the SJV MDP EIR was prepared for the Line E Channel in order to modify the alignment to avoid sensitive environmental resources and significant water and wastewater infrastructure that would limit the constructability of Line E Channel as envisioned in the SJV MDP. Figure 1 depicts the regional location of Line E Channel, and Figure 2 represents the original alignment of the Line E facility per the SJV MDP and compares it to the currently proposed alignment of Line E facility as analyzed in the Addendum. This addendum addresses Line E (hereinafter “Line E”) which is one of the regional drainage facilities planned by the SJV-MDP. On June 2, 2026, in accordance with CEQA Guidelines Sections 15162 and 15164, the City of San Jacinto determined that the proposed Addendum to the previously adopted Environmental Impact Report for the San Jacinto Valley Master Drainage Plan (MDP) adequately addresses the Revision to Line E of the MDP, and that no subsequent or supplemental environmental review is required because the revision to Line E would not result in new or more significant environmental impacts than those previously analyzed and no substantial changes in circumstances have occurred that would create new or more significant environmental impacts.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 4 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 6 hours ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS