San Luis Canal (California Aqueduct Pools 17 and 18) Liner Raise Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Luis Canal Liner Raise Project, managed by the California Department of Water Resources, involves raising the concrete liner of the California Aqueduct's Pools 17 and 18 by approximately 1 foot 9 inches. This project spans roughly 8.9 miles between Milepost 128.4 and 135.6 in Fresno County to address subsidence and maintain water delivery functionality, safety, and operational flexibility. Construction is scheduled to begin in 2027 and is expected to be completed within nine months. The scope of work includes excavation using on-site borrow material, rerouting road drains, and the removal and reinstallation of guardrails and road delineators. All activities will be performed above the waterline, eliminating the need for dewatering the aqueduct. The project is subject to rigorous environmental compliance under CEQA and NEPA, with a Mitigated Negative Declaration indicating no significant adverse effects after mitigation. Key requirements include strict wildlife protection measures, such as the use of exclusion fencing, biological monitoring, and prohibitions on nighttime work within 500 feet of sensitive habitats. Contractors must also adhere to noise control standards and lighting restrictions to minimize impacts on biological resources. Regulatory oversight may include permits from the California Department of Fish and Wildlife for lake and streambed alterations and compliance with the Clean Water Act. Primary points of contact for the project include Marea Bell, Sarah Cannon, and Jesse Dillon.

General Info

CDWR will raise California Aqueduct liners in Fresno County starting in 2027.

Agency

California Water Resources, Department of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

W Clarkson Avenue; Mount Whitney Avenue, CA, 93608

Set-Aside

NONE

Documents

(7)

DOCUMENT_Pools1718LinerRaise_FinalMND-DraftMND-Combined-OCR_Final

PDF

San Luis Canal Pools 17 and 18 Liner Raise Project SCH Summary

PDFenvironmental-summary

San Luis Canal Pools 17 and 18 Liner Raise Project Notice of Completion

PDFnotice-of-completion

San Luis Canal Pools 17 and 18 Liner Raise Project Notice of Completion

PDFnotice-of-completion

Notice of Intent for San Luis Canal Pools 17 and 18 Liner Raise Project

PDFpresolicitation

CDFW Comment Letter on San Luis Canal Liner Raise Projects MNDs

PDFcomment-letter

San Luis Canal Pools 17-18 Liner Raise Project IS/MND October 2025

PDFinitial-study-mitigated-negative-declaration

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Marea BellSenior Environmental Scientist (Specialist)
Catherine McEfeeVice President

Interested Companies (2)

Show more
ESA
San Francisco, CA
Environmental Science Associates
Los Angeles, CA

Full Description

Show more
The proposed project would raise portions of the concrete liner of the California Aqueduct's Pools 17 and 18 between Milepost (MP) 128.4 and MP 135.6 to maintain functionality in Pools 17 and 18 to enable DWR to avoid future disruptions of water deliveries to the Public Water Agencies, thereby maintaining operational flexibility and improving safety and reliability. The existing concrete liner would be raised approximately 1 foot 9 inches over a total length of approximately 8.9 miles on both sides of Pools 17 and 18. Construction activities would be performed above the waterline and would not require dewatering of the Aqueduct. Work would include excavation and use of on-site borrow material, road drain rerouting, and the removal and reinstallation of guardrails, road delineators and other existing features. Construction is anticipated to begin in 2027 and conclude within nine months.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 22 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS