Vic Trace Reservoir Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Vic Trace Reservoir Replacement Project, identified by solicitation number PRE2025-0035 and project number 41510, is a public works initiative by the City of Santa Barbara to modernize aging water infrastructure. The primary objective is to enhance the reliability, resiliency, and operational flexibility of the city water system while complying with federal security regulations. The scope of work includes the demolition of an existing 10-million-gallon reservoir and the construction of two new 5-million-gallon circular, prestressed concrete reservoirs that will be fully buried. Onsite improvements feature a new valve building for pumps and disinfection systems, the re-abandonment of an existing oil well, and the installation of retaining walls and landscaping. Offsite work involves the replacement and relocation of underground water pipelines within the Alta Mesa neighborhood and the relocation of a pressure reducing valve station. The project is scheduled for construction over a three-year period, anticipated to begin in July 2028 and conclude by August 2031. Performance will occur at the Vic Trace Reservoir parcel at 740 Dolores Drive, with additional work in surrounding public rights-of-way and the use of a city-owned property at 1633 La Coronilla Drive for temporary offices. Environmental reviews have identified potential impacts on air quality, biological resources, and cultural assets, with noise impacts noted as significant and unavoidable. The project is managed by the City of Santa Barbara Public Works Department, with Kelly Bourque serving as the Supervising Engineer and primary point of contact.

General Info

City of Santa Barbara project replacing Vic Trace Reservoir from July 2028 to August 2031.

Agency

California → City of Santa Barbara

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

La Coronilla Drive, Dolores Drive, Ricardo Avenue, Santa Barbara, CA, 93109

Set-Aside

NONE

Documents

(13)

Vic Trace Reservoir Replacement Project Notice of Completion

PDFnotice-of-completion

_LCI_Memo_for_NOP

ZIP

Vic-Trace-Reservoir-Replacement-Project_Draft-EIR_wAppendices

PDF

Vic Trace Reservoir Replacement Project Initial Study

PDFinitial-study

CDFW Comment on Vic Trace Reservoir Replacement Project NOP

PDFcomment

2025110233 DWR Comment on Vic Trace Reservoir Replacement Project

PDFcomment-letter

Vic Trace Reservoir Replacement Project Notice of Completion

PDFnotice-of-completion

Vic Trace Reservoir Replacement Project Draft EIR Notice of Availability

PDFnotice-of-availability

SCH Summary Form for Vic Trace Reservoir Replacement Project

PDFenvironmental-summary

SCH #2025110233 Vic Trace Reservoir Replacement Project Memo

PDFmemo

Vic Trace Reservoir Replacement Project - Notice of Preparation

PDFnotice-of-preparation

NAHC Comment Letter on Vic Trace Reservoir Replacement Project

PDFcomment-letter

SCH 2025110233 Vic Trace Reservoir Replacement Project Summary

PDFenvironmental-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Barbara
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Santa Barbara
Office AddressN/A
Contacts
Kelly BourqueSupervising Engineer
Amanda AntonelliSenior Environmental Planner/Project Manager
Kelly BourqueSupervising Engineer

Interested Companies (2)

Show more
Rincon Consultants
San Diego, California
Rincon Consultants
Monterey, CA

Full Description

Show more
The proposed Project would replace aging water infrastructure and implement improvements to enhance the reliability, resiliency, and operational flexibility of the City’s water system. The Project would involve demolition of the existing 10-million-gallon Vic Trace Reservoir and construction of two new 5-million-gallon reservoirs at the same site. The new reservoirs would be fully buried below finished grade with soil cover. Additional onsite improvements include replacement of the existing Valve Building with a new facility housing pumps, disinfection systems, and electrical equipment; reabandonment of an existing oil well in accordance with current regulatory standards; construction of new access roads, landscaping, and site infrastructure; and potential installation of renewable energy generation and storage systems. Offsite improvements include installation, replacement, and relocation of underground water pipelines within surrounding streets; construction of a new underground pressure reducing valve (PRV) station and abandonment of the existing PRV station; and temporary use of a City-owned residential property for construction offices. Project construction would occur over an approximately three-year period and would include demolition, grading, excavation, pipeline installation, and facility construction activities.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS