Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Van Norden Meadow Restoration and Recreation Project

Awarded
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sierra Nevada Conservancy is providing funding to the South Yuba River Citizens League for the Van Norden Meadow Recreation Project, located on 485 acres of Tahoe National Forest land within Placer and Nevada counties. The project aims to protect sensitive meadow habitats by managing recreational use through the construction and improvement of formalized trail alignments. Key deliverables include a 5.5-mile multi-use loop trail featuring interpretive signage, boardwalks, and viewing platforms, as well as two new trailheads and a connector trail linking the loop to the existing adjacent trail network. The project was approved on June 4, 2026, following an Initial Study and Mitigated Negative Declaration certified by Nevada County on May 11, 2022. The Sierra Nevada Conservancy has independently determined that the project will not result in significant adverse environmental impacts, provided that all work complies with the established Initial Study and Mitigated Negative Declaration. Consequently, the project includes specific mitigation measures and a monitoring plan as conditions of approval to ensure environmental compliance. The Sierra Nevada Conservancy serves as the public agency, while the Nevada County Planning Department acts as the lead agency.

General Info

Sierra Nevada Conservancy funds Van Norden Meadow trail and boardwalk restoration to enhance sustainable recreation while protecting ecology.

Agency

California → Nevada County

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

SNC1926-RT Van Norden Meadow Recreation Project Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Nevada County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Nevada County
Office AddressN/A
Contacts
Andy FristenskyField Operations & Grants Division Chief
Alecia WeismanWatershed Science Director

Full Description

Show more
The Sierra Nevada Conservancy (SNC) would provide funding to the South Yuba River Citizens League for the Van Norden Meadow Recreation Project (Project). Van Norden Meadow is a 485-acre meadow on Tahoe National Forest land. The Project would build and improve formalized trail alignments to manage ongoing recreational use to protect sensitive meadow habitat. Grant funding would be used to develop a multi-use 5.5-mile loop trail, with interpretive signage, boardwalks and viewing platforms, and two new trailheads; as well as a connector trail that connects the loop trail to the adjacent trail network. Nevada County evaluated the Project in an Initial Study and Mitigated Negative Declaration, which was certified on May 11, 2022. The SNC has reviewed the Initial Study and Mitigated Negative Declaration and has independently determined that the Project would not result in significant adverse environmental impacts. All work will be performed in compliance with Nevada County’s Initial Study and Mitigated Negative Declaration.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS