Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Arrow Commerce Center Project

Awarded
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Arrow Commerce Center Project in Rancho Cucamonga, California, encompasses the comprehensive development of a large-scale industrial logistics complex comprising five two-story warehouse and office buildings totaling approximately 1.83 million gross square feet. The project involves complete demolition and site clearing of existing paved surfaces, followed by extensive grading, excavation, and construction of new infrastructure including loading docks for 444 truck trailers, 968 vehicle parking spaces, six new public streets, water quality basins, utility systems, exterior lighting, and signage. The development will result in 44 acres of impervious surface with roughly 10 percent designated for landscape coverage. All activities must comply with Rancho Cucamonga Municipal Code §17.66.110 (Class C Performance Standards), which enforce strict ambient standards for noise, particulate matter, air contaminants, odor, heat, glare, and vibration to ensure emissions remain undetectable to the average person beyond property lines and that no perceptible odors escape site boundaries. Environmental compliance is further governed by CEQA guidelines, SCAQMD rules, CARB 2010 engine standards for trucks, and CALGreen Code requirements for green building practices. The project site is located on Arrow Route and Juneberry Drive, with all work to be performed on-site in the City of Rancho Cucamonga, under oversight by the City’s Planning and Engineering departments. The City will conduct regular inspections and hold final acceptance authority, ensuring adherence to all technical specifications, stormwater Best Management Practices outlined in Exhibit C, and California Building Energy Code standards. Proposal submissions must include mandatory attachments such as existing condition photos, BMP design calculations, and drainage plans, and are due by November 17, 2025, via the CEQAnet portal or through mailed deliverables to the Planning Department. While no formal contract value, pricing structure, or clause identifiers from FAR Part 52 are available, the procurement context suggests a public works initiative requiring environmental documentation and code compliance as core evaluation criteria. Key administrative contacts include Christine Delostrinos as Senior Planner and Chris Sanford of Thienes Engineering, Inc. as Director of Engineering, though no formal COR, COTR, or PCO designations have been publicly identified. No subcontracting requirements, socioeconomic set-asides, or invoicing protocols such as WAWF are specified, and contractual payment terms, accounting codes, or delivery schedules remain unstated in the available documentation.

General Info

Rancho Cucamonga to build 1.83M sq ft warehouse complex with infrastructure on 44 acres.

Agency

California → City of Rancho Cucamonga

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Arrow Route and Juneberry Drive, Rancho Cucamonga, CA, 91739

Set-Aside

NONE

Documents

(22)

Arrow Commerce Center Project Final Environmental Impact Report

PDFenvironmental-impact-report

Arrow Commerce Center Environmental Impact Summary

PDFenvironmental-summary

Arrow Commerce Center Project Draft Environmental Impact Report Comments

PDFcomment-letter

Hydrology and Water Quality Technical Study for Arrow Commerce Center

PDFtechnical-study

Apdx L_Alt2_Tech_Data

PDF

Apdx F_Phase 1_ESA

PDF

Arrow Commerce Center Project Notice of Completion

PDFnotice-of-completion

Mitigation Monitoring and Reporting Program for Arrow Commerce Center Project SCH No. 2023110033

PDFmitigation-monitoring-reporting-program

Arrow Commerce Center Project Cultural Resources Technical Report

PDFcultural-resources-technical-report

Appendix H Noise and Vibration Modeling Results

PDFnoise-modeling-report

CPUC Comment Letter on Arrow Commerce Center Project DEIR SCH 2023110033

PDFcomment-letter

Arrow Commerce Center Draft Environmental Impact Report October 2025

PDFenvironmental-impact-report

Arrow Commerce Center Non-CEQA Level of Service Study

PDFstudy-report

Preliminary Geotechnical and Geohazards Technical Report - Arrow Commerce Center Project

PDFgeotechnical-report

Appendix C - Air Quality, GHG Emissions, and Health Risk Assessment

PDFsow

Notice of Determination – Arrow Commerce Center Project

PDFspecial-notice

Appendix C Biological Resources Technical Report for Arrow Commerce Center Project

PDFtechnical-report

Arrow Commerce Center Project Draft Environmental Impact Report NOA

PDFspecial-notice

Arrow Commerce Center CEQA Transportation Impact Study August 2024

PDFceqa-transportation-impact-study

Appendix K Water Supply Assessment for Arrow Route Commerce Center Project

PDFwater-supply-assessment

Notice of Preparation for Arrow Commerce Center Project Draft EIR

PDFnotice-of-preparation

Appendix B Air Quality, GHG Emissions, and Health Risk Assessment Modeling Results

PDFsupporting-document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

forecast

Notice updated

The point of contact changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Rancho Cucamonga
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Rancho Cucamonga
Office AddressN/A
Contacts
Sean McPhersonPrincipal Planner
Marlie LongSenior Environmental Planner

Interested Companies (1)

Show more
Ascent
SACRAMENTO, CA

Full Description

Show more
The proposed project includes the demolition and site clearing of existing paved surface areas and site grading, excavation, and the construction, operation, and maintenance of five 2-story buildings consisting of approximately 1,830,729 gross square feet of new building floor area for warehouse distribution and associated office space. The project also includes loading docks for truck trailers, 968 vehicle parking spaces, 444 truck trailer parking spaces, 6 new public streets, water quality basins, utility infrastructure, and exterior lighting and signage. The proposed project would develop the project site with 44 acres of paved or other impervious surface area and provide approximately 10 percent landscape coverage.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 14 hours ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS