Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

San Joaquin River Conservancy River West Fresno, Eaton Trail Extension Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Joaquin River Conservancy River West Fresno, Eaton Trail Extension Project, identified by solicitation number 2014061017 and WCB Project Tracker ID 2026046, represents the first phase of construction for a larger development effort in Fresno, California. The project scope involves the construction of 2.4 miles of accessible trails and the development of a new river access point near State Route 41. Additional infrastructure includes the installation of parking facilities, bathrooms, landscaping, and other access amenities at the SJRC River West property. A specific technical requirement includes the addition of approximately 320 feet of sidewalk, curb, and gutter on the south side of the Perrin Avenue undercrossing, along with an accessible curb ramp on the east side to connect the existing Lewis S. Eaton Trail across State Route 41. The project is managed by the San Joaquin River Conservancy and the Wildlife Conservation Board, with Kari Daniska and Erin Aquino-Carhart serving as the primary points of contact. Environmental compliance has been established through the California Environmental Quality Act, with Notices of Determination issued in October 2025 and May 2026 confirming that the project adheres to CEQA guidelines. These notices certify that the project will not have a significant environmental effect, supported by an Environmental Impact Report and a specific addendum for the sidewalk and curb work. The project is classified under NAICS code 237990.

General Info

SJRC project constructing 2.4 miles of accessible trails and river access in Fresno.

Agency

California → San Joaquin River Conservancy

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Fresno, CA

Set-Aside

NONE

Documents

(2)

NOD - River West Fresno Eaton Trail Extensions Project

PDFnotice-of-determination

Notice of Determination for River West Fresno, Eaton Trail Extension Project

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin River Conservancy
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Joaquin River Conservancy
Office AddressN/A
Contacts
Kari DaniskaExecutive Director
Erin Aquino-CarhartSan Joaquin River Conservancy Program Manager

Full Description

Show more
The proposed project is the first phase for the overall project's construction. It will construct 2.4 miles of accessible trails, a new river access point near State Route 41, parking, bathrooms, landscaping, and other access amenities at the SJRC River West property. WCB Project Tracker ID: 2026046.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 6 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 18 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS