Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Junipero Serra Museum ADA Improvements

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project entails the development of a new parking area south of the Junípero Serra Museum at 2727 Presidio Drive in Presidio Park, San Diego, featuring five ADA-compliant parking spaces and four standard spaces on an undeveloped knoll. Accompanying improvements include sidewalks along the northwestern edge of the lot, an accessible path connecting the parking area to the museum, a driveway linking the lot to Presidio Drive, a 12-inch storm drain with two catch basins, two winged concrete headwalls, and a bioretention basin at the base of the driveway to manage runoff. A Multi-Habitat Planning Area boundary adjustment will revise the designated land by removing 0.31 acre and adding 0.86 acre, effectively expanding the protected area netting a gain of 0.55 acre. The initiative is being pursued under a Site Development Permit and is part of broader efforts to enhance accessibility and environmental stewardship in the historic park setting. The City of San Diego is managing this project through its designated office in California, with Nancy Graham serving as Program Manager and Jamie Kennedy as Senior Planner, both reachable via provided contact information. The contract opportunity was posted on June 2, 2026, and is classified as a forecast indicating future intent for procurement rather than an active solicitation. The place of performance is clearly defined as San Diego, California, with the zip code 92101, and all work will be executed in compliance with ADA standards and local environmental regulations. While the solicitation number, NAICS code, and set-aside details are not yet specified, the project reflects a commitment to infrastructure upgrades that support public access and ecological balance within a culturally significant location.

General Info

Develop parking with ADA spaces, access paths, storm drainage, and bioretention in Presidio Park, expanding protected land by 0.55 acre.

Agency

California → City of San Diego

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Presidio Drive, San Diego, CA, 92101

Set-Aside

NONE

Documents

(13)

Junipero Serra Museum ADA Improvement Project Notice of Completion

PDFnotice-of-completion

Junipero Serra Museum ADA Improvement Draft MND Notice of Availability

PDFspecial-notice

Junipero Serra Museum Air Quality and GHG Emissions Modeling Report

PDFreport

App G_Juniperoe Serra SWQMP_acc

PDF

Junipero Serra Museum ADA Improvement Project Historical Resources Technical Report April 6, 2026

PDFhistorical-resources-technical-report

Drainage Study for Junipero Serra Museum ADA Improvements

PDFstudy-report

Junipero Serra Museum ADA Improvements Mitigated Negative Declaration

PDFmitigated-negative-declaration

Historical Resources Survey for Junipero Serra Museum ADA Improvements Project

PDFhistorical-resources-survey

Junipero Serra Museum ADA Improvements Biological Survey Update

PDFbiological-survey-report

Tree Survey Letter Report for Junipero Serra Museum ADA Improvements Project

PDFtree-survey-report

Junipero Serra Museum ADA Improvements Summary Form

PDFenvironmental-summary

Junipero Serra Museum ADA Improvements Project SWQMP

PDFswqmp

Geotechnical Investigation Report for Junipero Serra Museum ADA Improvements

PDFgeotechnical-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of San Diego
Office AddressN/A
Contacts
Nancy GrahamProgram Manager
Jamie KennedySenior Planner

Full Description

Show more
The project would include a Site Development Permit, Multi-Habitat Planning Area (MHPA) Boundary Line Adjustment, and contract award, to allow construction of a new parking lot with five Americans with Disabilities Act (ADA) parking spaces and four standard parking spaces on the undeveloped knoll to the south of the Junípero Serra Museum at 2727 Presidio Drive in Presidio Park. Other improvements include sidewalks along the northwestern edge of the proposed parking lot, an ADA-compliant path from the proposed parking lot to the museum, a driveway from the proposed parking lot to Presidio Drive, a 12-inch storm drain with two catch basins, two winged concrete headwalls, and a bioretention basin at the base of the proposed driveway. A Boundary Line Adjustment (BLA) to the MHPA would remove 0.31 acre and add 0.86 acre to the MHPA.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 10 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 23 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS