Lower Wilder Ranch Trail Restoration

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Lower Wilder Ranch Trail Restoration project aims to enhance trail safety and reduce user conflict within Wilder Ranch State Park by rehabilitating key trail segments on the Eucalyptus Loop, Old Cabin, and Wild Boar Trails, along with the Fern Grotto Beach Access. Work includes removing redundant and poorly aligned trails, restoring topography to mitigate erosion and sedimentation, and eliminating unofficial bypass paths. On the Fern Grotto Beach Access, one wood puncheon and 50 linear feet of trail will be removed, replaced by 30 linear feet of wooden cantilevered steps. On the Eucalyptus Loop, a 6,000-foot trail reroute will be constructed under forest canopy, replacing 5,000 feet of outdated road in the meadow, with 59,510 square feet of land restored. Five steel I-beam bridges and one wood puncheon will be installed with concrete abutments, and 170 feet of drainage lens will be added across five locations, along with trail reconstruction to ensure proper outslope and water flow. The Old Cabin Trail will see a 3,750-foot reroute moving the path away from the ridge and watercourse, with 3,500 feet of degraded trail removed and the surrounding area restored. A steel I-beam bridge and wood puncheon will be supported by 68 cubic feet of excavation for concrete foundations, and trail sections will be rebuilt with improved drainage alignment. On the Wild Boar Trail, a 2,400-foot reroute will shift the path out of the meadow and off the fall line, removing 2,210 feet of existing road and restoring both meadow and forest understory. A 75-foot drainage lens will be installed, and trail surfaces will be recontoured to correct outslope and manage runoff. All efforts are focused on reducing environmental impact, improving trail sustainability, and enhancing visitor experience across the park’s trail network.

General Info

Restore and reroute trails, remove redundant paths, install bridges and drainage, and restore terrain to enhance safety and sustainability.

Agency

California Parks and Recreation, Department of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA, 95060

Set-Aside

NONE

Documents

(1)

Lower Wilder Ranch Trail Restoration Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Linda HitchcockSenior Park and Recreation Specialist

Full Description

Show more
Project proposes to improve existing trail alignments within Wilder Ranch State Park to reduce user conflict and improve trail safety. The work is proposed for portions of the Eucalyptus Loop, Old Cabin, and Wild Boar Trails will alleviate erosion, reduce sediment delivery into nearby drainages, and curtail the creation of unofficial trail segments used to bypass trail obstacles. Work will occur as follows: On the Fern Grotto Beach Access • Remove one (1) wood puncheon; • Remove approx. 50 linear feet (LF) of poorly aligned and redundant trail; and • Construct 30 LF of wood cabling steps leading down existing trail to beach. On the Eucalyptus Loop Trail: • Construct an approx. 6,000 LF reroute of the eastern segment of the road and construct a new approx. 4ft wide trail on contour under forest canopy; • Remove approx. 5,000 LF of poorly aligned road in the meadow and topographically Restore approx. 59,510 sq ft of the meadow; • Excavate approx. 300 cu. ft. to install concrete abutments and approaches for five (5) steel I-beam bridges and one (1) wood puncheon. • Construct approx. 170 ft of 6ft wide drainage lens along trail (5 locations); and • Reconstruct sections of the trail with corrected outslope to facilitate proper drainage. On the Old Cabin Trail: • Construct an approx. 3,750 LF reroute to pull the existing trail off the ridge line and away from the water course; • Remove approx. 3,500 LF of poorly aligned trail and topographically restore the area • Excavate approx. 68 cu. ft. for concrete abutments and approaches for one (1) steel I-beam bridge and one (1) wood puncheon; and • Reconstruct sections of the trail with corrected outslope to facilitate proper drainage. On the Wild Boar Trail: • Construct an approx. 2,400 LF reroute to pull existing trail out of the meadow and off of the fall line; • Remove approx. 2,210 LF of poorly aligned road and restore the meadow and forest understory; • Construct a 75ft long x 6ft wide drainage lens along the trail; and • Reconstruct sections of the trail with corrected outslope to facilitate proper drainage.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 13 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS