City of Beaumont Stream Gage Installation Project

Forecast
E-202600434State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Beaumont is implementing the Stream Gage Installation Project to support efforts to increase the beneficial use of treated wastewater and reduce discharges into Coopers Creek. Following the findings of the Coopers Creek and San Timoteo Creek Habitat Characterization and Sustainability Report, the city is establishing a baseline monitoring program to better understand surface water conditions, including stage flow, temperature, and specific conductance. This high-frequency data is essential for analyzing long-term and short-term trends in surface water flow downstream of the Beaumont wastewater treatment plant and evaluating the impact of storms and discharges on groundwater and surface water interactions. The project involves the installation of four new stream gages across four separate sites in Riverside County. These locations include one site along Coopers Creek (CC-03) and three sites along San Timoteo Creek (STC-01, STC-02, and YVWD-A). The project is managed by Thaxton Van Belle, Director of Water Reclamation, and has been granted a Class 6 Categorical Exemption under Section 15306, as the installation is for information collection and is not expected to cause significant environmental disturbance.

General Info

City of Beaumont installing four stream gages to monitor wastewater and surface water.

Agency

California → City of Beaumont

Place of Performance

Beaumont, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Beaumont
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Beaumont
Office AddressN/A
Contacts
Thaxton Van BelleDirector of Water Reclamation

Full Description

Show more
The City of Beaumont seeks to increase the beneficial use of its treated wastewater that is currently being discharged to Cooper’s Creek. To support this effort, the City prepared the Cooper’s Creek and San Timoteo Creek (CCSTC) Habitat Characterization and Sustainability Report. The purpose of the report was to inform strategies for reducing recycled water discharges and to prepare an Adaptive Management and Mitigation Plan (AMMP) for riparian habitat along Cooper’s Creek and San Timoteo Creek that could be impacted by reduced flows. The City is presently pursuing analysis and implementation of reducing its discharge of treated wastewater (i.e. recycled water) from the Beaumont wastewater treatment plant (WWTP) to Cooper’s Creek, and divert that water for other beneficial uses discussed below. The CCSTC Habitat Characterization and Sustainability Report (Phase 1 Report) identified the need for a baseline monitoring program for information gathering purposes, and the need for surface water monitoring (stage, flow, temperature, and specific conductance [SC]) was identified. The high-frequency flow, temperature, and SC data will provide a more comprehensive understanding of the long-term and short-term trends in surface water flow downstream of the WWTP and help understand surface water conditions in response to storms and discharges from the Beaumont WWTP. The high-frequency data will also help discern groundwater and surface water interactions downstream of the WWTP. The project proposes a total of 4 new stream gages located at the locations described under project locations, above.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 6 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, fence installation covering 500 meters, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. The work must adhere to specific standards, including the Agency Guide to Cave and Mine Gates 2009 and a Physical Mine Hazards Risk Assessment. The anticipated contract start date is January 7, 2026, with a primary term of two years and an option to extend for one additional year. The selection process is a three-stage evaluation. Stage 1 verifies mandatory requirements, while Stage 2 evaluates technical capabilities, requiring a minimum score of 70% to proceed. Technical evaluation focuses on project experience, roles and responsibilities, occupational health and safety, and a plan for Indigenous community beneficial participation. Stage 3 is a commercial evaluation based on the lowest bid price. Bidders must provide a detailed methodology, a Gantt chart schedule, and focused resumes for key personnel, including a Professional Engineer and various technical leads. Mandatory requirements include proof of W.S.I.B coverage, insurance, and tax compliance verification.
Energy and Mines

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 7 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS