Recharge Basin Flow Measurement and Modernization Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Consolidated Irrigation District plans to modernize five existing recharge basins within its 1,500-acre operation area in the Central Kings Groundwater Sustainability Agency boundary by installing flow measurement systems, control devices, and SCADA/telemetry technology at each turnout facility. This initiative aims to enhance the district’s capacity to accurately measure, monitor, and manage water deliveries to these basins, improving operational efficiency and regulatory compliance. The project will require minor ground disturbing activities to embed equipment, run conduits, pour small concrete foundations, and make localized structural adjustments, all designed to minimize environmental impact while maximizing functionality. Funded through a combination of grant resources and local capital, the Recharge Basin Flow Measurement and Modernization Project will enable real-time data collection and remote monitoring of water flows, allowing for more precise water allocation and better documentation of recharge activities. The effort supports broader groundwater sustainability goals by providing reliable data for reporting and management decisions. Michael Carbajal, Assistant General Manager at the Consolidated Irrigation District, serves as the point of contact for inquiries related to the project, which was posted as a forecast on May 29, 2026, and is situated entirely within California.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
