Feather River Salmonid Habitat Improvement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Phase 2 of the Feather River Salmonid Habitat Improvement Project proposes the placement of approximately 7,900 cubic yards of clean spawning gravel across six designated locations within the original project footprint along the Feather River in Oroville, California. This phase follows Phase 1, completed in 2023, during which around 16,260 cubic yards of gravel were installed; some of that material has since been displaced by natural river flows and will be replenished as part of this effort. Two alternate locations are also included in the plan to accommodate any remaining gravel volume if the primary sites are fully utilized. In addition to the new gravel placement, approximately 100 cubic yards of accumulated sediment at the entrance of Moe’s side channel will be mechanically redistributed to enhance the adjacent Top of Auditorium Riffle spawning habitat. The project is led by the California Department of Water Resources with oversight from senior environmental scientist Lynn Coster and General Manager Roger Cornwell, and is intended to support the recovery and proliferation of native salmonid species through the restoration of critical spawning grounds.

General Info

Phase 2 replenishes spawning gravel in Feather River to restore salmonid habitat, building on prior work and redistributing sediment.

Agency

California Water Resources, Department of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Oroville, CA

Set-Aside

NONE

Documents

(1)

5A04CR00389 Feather River Salmonid Habitat Improvement Project Phase 2 CEQA Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Lynn CosterSenior Environmental Scientist
Roger CornwellGeneral Manager

Full Description

Show more
The proposed project is Phase 2 of the Feather River Salmonid Habitat Improvement Project (FRSHIP). FRSHIP was previously certified under WDID 5A04CR00349 to place approximately 16,260 cubic yards of clean spawning gravel. Phase 2 proposes to place approximately 7,900 cubic yards of clean spawning gravel. Areas in need of additional spawning gravel have recently been identified within the original footprint of the proposed project. Some of the gravel placed during Phase 1 in 2023 has been washed downstream and would be replaced as part of Phase 2. The total of approximately 7,900 cubic yards of imported spawning gravel would be placed at six locations, with two alternate locations also being included if there is still spawning gravel available of the allotted 7,900 cubic yards. Approximately 100 cubic yards of accumulated material at the entrance of Moe’s side channel would also be redistributed within the adjacent Top of Auditorium Riffle spawning site.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 6 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 18 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS