Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Magenta Drain Restoration

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Magenta Drain Restoration Project will restore a degraded 800-foot segment of an artificial drainage channel within Memorial Park in Grass Valley, California, transforming it into a functional riparian ecosystem. Originally constructed in the 1800s to manage mining discharges, the channel remains ecologically impaired despite remediation of legacy contamination, with steep, uniform banks, invasive vegetation, and minimal habitat complexity. The project will focus on habitat enhancement across 0.67 acre of the 0.73-acre project area, involving re-contouring 0.09 acre to improve channel stability and hydrology, placing habitat boulders across 0.08 acre to create aquatic microhabitats, and removing invasive species while revegetating 0.56 acre with native riparian trees, shrubs, and understory plants to restore canopy cover, reduce erosion, and support wildlife. Additionally, 0.03 acre of bioengineered rock slope protection will replace an aging retaining wall, using natural materials to stabilize banks and promote ecological connectivity. Incidental recreational improvements totaling 0.07 acre include a gravel trail and limited access steps and seating boulders designed to provide controlled public viewpoints without disrupting restoration efforts. No new structures, land use changes, or expanded developments are included. All work is confined to enhancing the existing degraded drainage corridor, with the goal of increasing ecological function, improving waterway stability, and creating a self-sustaining riparian habitat. The project, forecasted for release in June 2026 by the City of Grass Valley, is led by City Planner Amy Wolfson and will result in a significantly more resilient and biodiverse ecosystem compared to current conditions.

General Info

Restore 800-foot degraded drain to native riparian habitat with recontouring, boulders, native planting, and bioengineered slopes.

Agency

California → City of Grass Valley

Place of Performance

Central Avenue, Race Streets, Grass Valley, CA, 95945

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Grass Valley
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Grass Valley
Office AddressN/A
Contacts

Full Description

Show more
The Magenta Drain Restoration Project is a habitat restoration effort that will occur along an approximately 800 linear-foot segment of Magenta Drain within Memorial Park. Magenta Drain is a historically altered, artificial channel originally constructed in the mid 1800s to convey groundwater and mining discharges from the Empire Mine area. Although legacy mining contamination has been remediated, the channel remains highly degraded and ecologically impaired, characterized by a steep, uniform V-shaped profile, disturbed fill substrates, limited channel complexity, and a riparian corridor dominated by invasive plant species and nonnative ornamental trees. Existing conditions provide minimal aquatic or riparian habitat and limited ecological function. The project will restore approximately 0.73 acre, with 0.67 acre (91%) consisting of habitat restoration activities. Restoration components include re-contouring the channel and banks in key areas totaling 0.09 acres to improve stability and hydrologic function, habitat boulder augmentation within approximately 0.08 acres to increase channel complexity and aquatic microhabitats (of this 0.08 acres, individual habitat boulders total 0.02-acres with the remaining area consisting of the existing substrate), and invasive species removal and native riparian revegetation across approximately 0.56 acres. Revegetation will utilize regionally appropriate native riparian trees, shrubs, and understory species to establish a dense canopy to improve shading and suppress reestablishment of invasive species while enhancing wildlife habitat. Approximately 0.03 acres of vegetated rock slope protection will be installed to replace an existing vertical retaining wall using bioengineered methods that stabilize banks while supporting ecological processes. Minor recreational improvements totaling approximately 0.07 acres (9% of the project area) are included and are incidental to the habitat restoration objectives. These consist of a gravel trail (approximately 0.05 acres) and limited creek access steps and seat boulders (approximately 0.01 acres) to provide controlled public access and viewing opportunities while avoiding disturbance to restored habitats. The project does not include new buildings, expansion of developed uses, or changes in land use designation. All work is limited to restoration and enhancement of an existing degraded drainage corridor. Upon completion, the project will result in a more stable and ecologically functional riparian ecosystem that improves habitat quality, channel stability, and ecological processes compared to existing conditions.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 6 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, fence installation covering 500 meters, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. The work must adhere to specific standards, including the Agency Guide to Cave and Mine Gates 2009 and a Physical Mine Hazards Risk Assessment. The anticipated contract start date is January 7, 2026, with a primary term of two years and an option to extend for one additional year. The selection process is a three-stage evaluation. Stage 1 verifies mandatory requirements, while Stage 2 evaluates technical capabilities, requiring a minimum score of 70% to proceed. Technical evaluation focuses on project experience, roles and responsibilities, occupational health and safety, and a plan for Indigenous community beneficial participation. Stage 3 is a commercial evaluation based on the lowest bid price. Bidders must provide a detailed methodology, a Gantt chart schedule, and focused resumes for key personnel, including a Professional Engineer and various technical leads. Mandatory requirements include proof of W.S.I.B coverage, insurance, and tax compliance verification.
Energy and Mines

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 7 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS