Magenta Drain Restoration

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Magenta Drain Restoration Project will restore a degraded 800-foot segment of an artificial drainage channel within Memorial Park in Grass Valley, California, transforming it into a functional riparian ecosystem. Originally constructed in the 1800s to manage mining discharges, the channel remains ecologically impaired despite remediation of legacy contamination, with steep, uniform banks, invasive vegetation, and minimal habitat complexity. The project will focus on habitat enhancement across 0.67 acre of the 0.73-acre project area, involving re-contouring 0.09 acre to improve channel stability and hydrology, placing habitat boulders across 0.08 acre to create aquatic microhabitats, and removing invasive species while revegetating 0.56 acre with native riparian trees, shrubs, and understory plants to restore canopy cover, reduce erosion, and support wildlife. Additionally, 0.03 acre of bioengineered rock slope protection will replace an aging retaining wall, using natural materials to stabilize banks and promote ecological connectivity. Incidental recreational improvements totaling 0.07 acre include a gravel trail and limited access steps and seating boulders designed to provide controlled public viewpoints without disrupting restoration efforts. No new structures, land use changes, or expanded developments are included. All work is confined to enhancing the existing degraded drainage corridor, with the goal of increasing ecological function, improving waterway stability, and creating a self-sustaining riparian habitat. The project, forecasted for release in June 2026 by the City of Grass Valley, is led by City Planner Amy Wolfson and will result in a significantly more resilient and biodiverse ecosystem compared to current conditions.

General Info

Restore 800-foot degraded drain to native riparian habitat with recontouring, boulders, native planting, and bioengineered slopes.

Agency

California → City of Grass Valley

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Central Avenue, Race Streets, Grass Valley, CA, 95945

Set-Aside

NONE

Documents

(1)

NOE Magenta Drain Restoration Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Grass Valley
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Grass Valley
Office AddressN/A
Contacts

Full Description

Show more
The Magenta Drain Restoration Project is a habitat restoration effort that will occur along an approximately 800 linear-foot segment of Magenta Drain within Memorial Park. Magenta Drain is a historically altered, artificial channel originally constructed in the mid 1800s to convey groundwater and mining discharges from the Empire Mine area. Although legacy mining contamination has been remediated, the channel remains highly degraded and ecologically impaired, characterized by a steep, uniform V-shaped profile, disturbed fill substrates, limited channel complexity, and a riparian corridor dominated by invasive plant species and nonnative ornamental trees. Existing conditions provide minimal aquatic or riparian habitat and limited ecological function. The project will restore approximately 0.73 acre, with 0.67 acre (91%) consisting of habitat restoration activities. Restoration components include re-contouring the channel and banks in key areas totaling 0.09 acres to improve stability and hydrologic function, habitat boulder augmentation within approximately 0.08 acres to increase channel complexity and aquatic microhabitats (of this 0.08 acres, individual habitat boulders total 0.02-acres with the remaining area consisting of the existing substrate), and invasive species removal and native riparian revegetation across approximately 0.56 acres. Revegetation will utilize regionally appropriate native riparian trees, shrubs, and understory species to establish a dense canopy to improve shading and suppress reestablishment of invasive species while enhancing wildlife habitat. Approximately 0.03 acres of vegetated rock slope protection will be installed to replace an existing vertical retaining wall using bioengineered methods that stabilize banks while supporting ecological processes. Minor recreational improvements totaling approximately 0.07 acres (9% of the project area) are included and are incidental to the habitat restoration objectives. These consist of a gravel trail (approximately 0.05 acres) and limited creek access steps and seat boulders (approximately 0.01 acres) to provide controlled public access and viewing opportunities while avoiding disturbance to restored habitats. The project does not include new buildings, expansion of developed uses, or changes in land use designation. All work is limited to restoration and enhancement of an existing degraded drainage corridor. Upon completion, the project will result in a more stable and ecologically functional riparian ecosystem that improves habitat quality, channel stability, and ecological processes compared to existing conditions.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 22 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS