Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

725-6MW-1214-Monitoring Well Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans has approved an encroachment permit for Rosecrans Partners LLC to access a single groundwater monitoring well, designated OB-21D, situated within state right-of-way between the Ayres Hotel and the southbound Route 405 off-ramp at Hindry Avenue in Manhattan Beach. The well, located at postmile 19.21 in Los Angeles County, will be sampled quarterly by Blaine Tech Services under the supervision of Bowyer Environmental Consulting, Inc., which is responsible for ensuring all equipment used is either new or properly decontaminated. All groundwater removed during sampling must be collected and hauled away from the site, with approximately seven sampling events planned over the permit's duration. Following the completion of monitoring, the well will be permanently abandoned according to regulatory standards. A licensed C-57 contractor will over-drill the well to total depth using a 10-inch hollow-stem auger to remove the casing, filter pack, and seal. The borehole will then be backfilled from the bottom up with a bentonite/cement slurry, terminating 0.5 feet below the surface, with the final 0.5 foot sealed using asphalt or cement to restore the original grade. No additional excavation, utility relocation, or acquisition of new right-of-way is required, and all work will be conducted without disrupting surrounding infrastructure or public services.

General Info

Rosecrans Partners LLC to sample OB-21D well quarterly, then permanently abandon it per regulations using C-57 contractor.

Agency

California → Caltrans, District 7 - Los Angeles

Place of Performance

Manhattan Beach, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 7 - Los Angeles
Office AddressN/A
Contacts
Mojgan AbbassiSenior Environmental Scientist

Full Description

Show more
Caltrans approves the encroachment permit for Rosecrans Partners LLC, seeking access to one (1) groundwater monitoring well located within Caltrans right-of-way. The well (OB-21D) is located between Ayres Hotel (14400 Hindry Ave., Hawthorne, CA 90250) and the southbound Route 405 off-ramp at Hindry Ave. at postmile (PM) 19.21, in the City of Manhattan Beach, County of Los Angeles. The well sampling activities will be conducted quarterly by Blaine Tech Services (contractor) and supervised by Bowyer Environmental Consulting, Inc. (BEC). BEC will ensure that only decontaminated or new monitoring and sampling equipment is utilized during quarterly sampling events. All groundwater purged from the well is collected in containers and removed from the site. It is estimated that approximately seven (7) quarterly sampling rounds will be conducted over the requested access period. BEC acknowledges that the OB-21D well will be abandoned following quarterly groundwater monitoring, in accordance with applicable regulatory requirements. A licensed (C-57 Contractor) driller shall over-drill the existing well to total depth using a 10-inch outside diameter hollow-stem auger to remove the well casing, filter pack, and annular seal. Once drilling is complete, the borehole will be backfilled with a bentonite/cement slurry from the bottom up to 0.5 feet below ground surface, using an auger or a PVC tremie pipe, per California Well Standard. The upper 0.5 foot will be completed with asphalt or cement to match the existing surface. There will be no other excavation. No public utilities will be relocated, and no new right-of-way will be acquired for the project.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 6 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, fence installation covering 500 meters, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. The work must adhere to specific standards, including the Agency Guide to Cave and Mine Gates 2009 and a Physical Mine Hazards Risk Assessment. The anticipated contract start date is January 7, 2026, with a primary term of two years and an option to extend for one additional year. The selection process is a three-stage evaluation. Stage 1 verifies mandatory requirements, while Stage 2 evaluates technical capabilities, requiring a minimum score of 70% to proceed. Technical evaluation focuses on project experience, roles and responsibilities, occupational health and safety, and a plan for Indigenous community beneficial participation. Stage 3 is a commercial evaluation based on the lowest bid price. Bidders must provide a detailed methodology, a Gantt chart schedule, and focused resumes for key personnel, including a Professional Engineer and various technical leads. Mandatory requirements include proof of W.S.I.B coverage, insurance, and tax compliance verification.
Energy and Mines

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 8 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS