Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Indian Slough Channel Capacity Restoration Project

Forecast
2026-00189State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Indian Slough Channel Capacity Restoration Project, managed by the East Bay Municipal Utility District, aims to protect critical raw water infrastructure on the Mokelumne Aqueduct right-of-way in Bixler, Contra Costa County. The project focuses on restoring the capacity of an engineered channel to prevent irrigation and stormwater runoff from overtopping the channel and flooding the right-of-way. Key activities include the removal of a beaver dam and the clearing of vegetation and trees along approximately 1,300 linear feet of the south side of the channel, covering a total area of 39,000 square feet. Work will be executed using an excavator operated from the gravel access road. The project is scheduled in two phases to avoid nesting bird seasons, with work occurring from mid-September through October 31st in both 2026 and 2027. Total completion is expected within six to eight weeks over this two-year period, with work hours restricted to weekdays from 7:00 a.m. to 3:00 p.m. Compliance requires jurisdictional permits from the Army Corps of Engineers, the Central Valley Regional Water Quality Control Board, and the California Department of Fish and Wildlife. Additionally, a qualified biologist must clear the site before construction and monitor all activities to ensure adherence to environmental and safety standards.

General Info

EBMUD project restoring Indian Slough Channel capacity via vegetation and beaver dam removal.

Agency

California → East Bay Municipal Utility District

Place of Performance

Orwood Road, off Bixler Road, CA, 94513

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → East Bay Municipal Utility District
Contacts1 person available
OfficeN/A
Organization / Agency
California → East Bay Municipal Utility District
Office AddressN/A
Contacts
Douglas HooperSuperintendent of Aqueduct

Full Description

Show more
The purpose of the project is to restore the capacity of the engineered channel, so irrigation runoff or stormwater runoff does not spill over the top of the channel onto the Mokelumne Aqueduct right-of-way, thereby limiting access to critical raw water infrastructure. The project will remove vegetation along the length of the channel, in addition to a beaver dam that is contributing to the vegetation overgrowth by restricting the water flow within the channel. See Attachment A for additional information. Overview and Background Indian Slough Channel (Channel) is an engineered channel that collects irrigation runoff and stormwater runoff from local farmland. The Indian Slough Capacity Restoration Project (Project) will restore the capacity of the channel by removing vegetation, in addition to removing an identified beaver dam. The confined Channel is choked with vegetation, creating low water flow conditions that are compounded by a beaver dam that controls the upstream water surface elevation. The Channel's manmade cut slopes were likely designed to handle transient increased water elevation and high flows but were not likely designed to sustain the current loading and saturation The volume of impounded water has increased the overall wetted perimeter and saturated zone of the Channel reach. Additionally, as storm runoff occurs, the Channel's reduced remaining free board would result in a greater likelihood of overtopping at or above the beaver dam. Over time, the upstream pool will also capture additional sediment, which would further decrease the channels overall capacity. The presence of the beaver dam is also increasing bank erosion at all flow levels as the flow is constricted and the water is accelerated around the perimeter of the dam. The project will remove vegetation growth along the length of the south side of the Channel. The beaver dam will be removed as part of the vegetation removal. The work will be performed using an excavator staged and operated from the gravel access road on the Aqueduct right-of-way. The Project is located on East Bay Municipal District's (EBMUD) Mokelumne Aqueduct rightof-way, near Bixler in Contra Costa County, see Figure la through Figure 1 b. Project Purpose and Objectives The purpose of the Project is to protect the Aqueduct right-of-way critical raw water infrastructure by preventing flooding of the right-of-way and collapse of the edge of the gravel access road through erosion of the bank of the Channel. The Project will restore the capacity of the Channel and reduce further erosion of the Channel bank. Project Location The Project is located on EBMUD's Mokelumne Aqueduct right-of-way near Bixler in Contra Costa County Project Characteristics The project will remove vegetation growth along the length of the south side of the Channel, approximately 1,300 linear feet. The extent of the vegetation removal from the bank to the Channel bed will be up to 30 feet, excavator's arm extent, for a total of 39,000 square feet. Identified trees within the project area will also be removed as they are contributing to the restricted water flow. The beaver dam will be removed as part of the vegetation removal. The work will be performed using an excavator staged and operated from the gravel access road on the Aqueduct right-of-way. Permits All work will be conducted on EB MUD property, so no encroachment permits are necessary. Jurisdictional permits will be obtained from the Army Corp of Engineers, the Central Valley Regional Water Quality Control Board, and the California Department of Fish and Wildlife. Schedule Work is scheduled in two phases. Phase One will be conducted after the 2026 nesting bird season, mid-September through October 31st. pending issuance of the required jurisdictional permits. Phase Two will be conducted in 2027 after the nesting bird season, mid-September through October 3 ist. The Project is expected to be completed within six to eight weeks over the two-year period. Work hours will be limited to weekdays with standard business hours of7:00 a.m.to 3:00 p.m. EBMUD Practices and Procedures Standard construction environmental and safety practices applicable to all EBMUD construction projects have been incorporated into the Project and will be implemented accordingly. A qualified biologist will clear the site prior to start-up of construction. All work will be monitored by the biologist, and in accordance with the jurisdictional permit requirements.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 6 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, fence installation covering 500 meters, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. The work must adhere to specific standards, including the Agency Guide to Cave and Mine Gates 2009 and a Physical Mine Hazards Risk Assessment. The anticipated contract start date is January 7, 2026, with a primary term of two years and an option to extend for one additional year. The selection process is a three-stage evaluation. Stage 1 verifies mandatory requirements, while Stage 2 evaluates technical capabilities, requiring a minimum score of 70% to proceed. Technical evaluation focuses on project experience, roles and responsibilities, occupational health and safety, and a plan for Indigenous community beneficial participation. Stage 3 is a commercial evaluation based on the lowest bid price. Bidders must provide a detailed methodology, a Gantt chart schedule, and focused resumes for key personnel, including a Professional Engineer and various technical leads. Mandatory requirements include proof of W.S.I.B coverage, insurance, and tax compliance verification.
Energy and Mines

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 7 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS