UC Nature Climate Monitoring Tower

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

UC Nature plans to install a temporary climate monitoring tower on the Sackett Ranch property near Winters, California, to collect environmental data as part of its research initiatives. The tower will be 30 feet tall and mounted on a 3-foot cube concrete pad, supported by three stabilization wires anchored to 1-foot cube concrete footings located approximately 15 feet from the base. The system will include a solar panel for power and a weatherproof enclosure housing monitoring and communications equipment, with no tree removal anticipated. Construction is scheduled for summer 2026 and is expected to take one week, with minimal environmental disruption. Upon completion of the project, the tower will be removed and the site restored using native plant species to ensure ecological recovery and habitat integrity. The University of California, Davis is leading the effort through its Campus and Environmental Planning office, with Heather Davis listed as the primary point of contact.

General Info

UC Davis to install temporary 30-foot climate tower on Sackett Ranch in 2026, remove it, restore native vegetation.

Agency

University of California, Davis

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

3373 Sackett Lane, Winters, CA

Set-Aside

NONE

Documents

(1)

NOE Cahill Reserve Weather Station UC Nature Climate Monitoring Tower

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUniversity of California, Davis
Contacts1 person available
OfficeN/A
Organization / Agency
University of California, Davis
Office AddressN/A
Contacts
Heather DavisDirector of Campus and Environmental Planning

Full Description

Show more
UC Nature (formerly the UC Natural Reserve System) proposes to install a temporary climate monitoring tower at the Sackett Ranch property. The project includes installation of a 30-foot-tall metal tower on a 3-foot by 3-foot by 3-foot concrete pad, three stabilization wires anchored to 1-foot by 1-foot by 1-foot concrete footings approximately 15 feet from the tower, a solar panel, and a weatherproof enclosure containing monitoring and communications equipment. No trees would be removed. Construction is anticipated to occur in summer 2026 and would take approximately one week. Upon rem oval of the tower, the site would be restored and revegetated with native plant species.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS