9th & Vineyard Development Project

Forecast
2019110456State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 9th and Vineyard Development Project, managed by the City of Rancho Cucamonga, involves the construction of three warehouse buildings totaling 982,096 square feet on a 45.97-acre site in San Bernardino County. The facility will consist of 969,096 square feet of warehouse space and 13,000 square feet of office space, supported by five driveways, 362 parking stalls, and 168 trailer parking stalls. A critical component of the project is the retention and rehabilitation of the historic Baker House for use as a City facility, which must be completed in accordance with the Secretary of the Interior Standards for the Treatment of Historic Properties and the 2021 McGee report. The project is subject to strict environmental and regulatory compliance, including the California Environmental Quality Act (CEQA) and the 1981 Comprehensive Storm Drain Plan for the City of Rancho Cucamonga. Key deliverables include a Mothballing Plan for the Baker House and an interpretive display, both requiring approval through the Certificate of Appropriateness process. Construction is scheduled in phases from January 2025 through November 2025, covering site preparation, grading, building construction, paving, and architectural coating. Additionally, the project requires ADA compliance modifications at specific intersections, including 9th Street and Vineyard Avenue, 8th Street and Vineyard Avenue, and Baker Avenue and 8th Street, to ensure efficient truck circulation.

General Info

Rancho Cucamonga project building three warehouses and rehabilitating the historic Baker House.

Place of Performance

9th Street and Vineyard Avenue, Rancho Cucamonga, CA, 91730

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Rancho Cucamonga
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Sean McPhersonPrincipal Planner

Full Description

Show more
The project involves the development of three warehouse buildings comprising 13,000 square feet (sf) of office space and 969,096 sf of warehouse space (totaling 982,096 sf) on a 45.97-acre property at the southwest corner of 9th Street and Vineyard Avenue. Associated site improvements include landscaping, five driveways, 362 parking stalls, and 168 trailer parking stalls. The project also involves the retention and rehabilitation of an existing historic building along the western border of the project site, known as the Baker House.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a total small business set-aside solicitation for a single firm fixed price contract. The scope of work involves a comprehensive interior modernization of Building 262, as well as associated buildings 261 and 263. Key requirements include replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades include the installation of raised flooring with integrated electrical distribution for classrooms, replacing variable air volume (VAV) systems, and upgrading lighting controls and ceiling fans. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the Notice to Proceed. Award will be based on a best suited negotiate methodology, evaluating price reasonableness alongside non-cost factors such as past performance and corporate relevant experience. Offerors must provide two to four past performance questionnaires for projects valued at $1,000,000 or more completed within the last five years. Proposals are due by November 18, 2026, and must be submitted electronically to the Contracting Officer. The contractor is required to provide payment and performance bonds, and personnel must adhere to strict security and safety protocols, including background checks and registration of vehicles on the federal facility.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000, managed by NAVFAC Mid-Atlantic, is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with epoxy mortar flooring, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the work includes electrical distribution and lighting upgrades, building automation controls, hazardous materials abatement, and site improvements such as paving, drainage, and utility repairs. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. Award will be based on the lowest price, evaluated by combining the costs for building renovation and paving removal and replacement. Proposals are due by November 23, 2026. Depending on the proposal value, bid, payment, and performance bonds may be required, with bid bonds set at 20 percent of the proposal amount. The contract is subject to the Davis-Bacon Act and Buy American requirements. Contractors must adhere to strict quality control frameworks, including a three-phase control system, and provide detailed closeout documentation such as O&M manuals and a 20-year warranty on roofing labor and materials. Invoicing is to be processed monthly via Wide Area WorkFlow with required NAVFAC certifications.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 17 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope includes comprehensive site preparations, underground stormwater retention, utilities, landscaping, and parking. An additional option for the P1016 facility involves a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, and VOSB certifications. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and sitework. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in 23 days
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a subcontracting opportunity for multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project aims to restore the first, second, and third floors to their original condition following a fire sprinkler discharge. The scope of work encompasses architectural repairs, including drywall replacement, painting, ceiling tile and drywall ceiling repair, and flooring installation, as well as electrical repairs and the replacement of vanities and cabinets. All work must comply with NFPA-101 Life Safety Code, ADA, OSHA, and EPA regulations, with Massachusetts state laws prevailing where more stringent. The project has a total period of performance of 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Bidders must attend a mandatory site visit on November 3, 2026, and submit a single lump sum proposal by November 17, 2026, including a detailed cost breakdown, a project timeline, and a 90-day bid guarantee. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). Required certifications include a valid Massachusetts Contractor's License, a Wage Rate Certification, and proof of insurance naming Adams and Associates, Inc. as an additional insured. Workmanship is guaranteed for one year, with a specific 20-year manufacturer warranty required for LVP flooring.
Grafton Job Corps

POSTED

about 4 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation is seeking proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring spaces damaged by water intrusion, including sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work requires the contractor to provide all labor, materials, and supervision to perform drywall installation, joint finishing, and painting, while managing the temporary removal and re-installation of HVAC equipment, water heaters, and furnaces. All work must be completed in a manner that ensures occupied-building protection and maintains required fire resistance and equipment clearances. The project is subject to the Davis Bacon Act, specifically wage determination OR20260100, Modification 1, requiring the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing by room and trade, a detailed project timeline, and evidence of relevant experience. Award requirements include the provision of payment and performance bonding for the full project value within ten days of award, as well as general liability insurance with a minimum of one million dollars per occurrence and three million dollars general aggregate. Final acceptance by CSD is contingent upon the successful testing of all restored mechanical, plumbing, electrical, and life-safety systems, the removal of debris, and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 4 hours ago

DEADLINE

in 13 days
View Details

More opportunities from California → City of Rancho Cucamonga

Same awarding agency

NAICS: 237990
SLED
Arrow Commerce Center Project
Solicitation # 2023110033
The Arrow Commerce Center Project in Rancho Cucamonga, California, encompasses the comprehensive development of a large-scale industrial logistics complex comprising five two-story warehouse and office buildings totaling approximately 1.83 million gross square feet. The project involves complete demolition and site clearing of existing paved surfaces, followed by extensive grading, excavation, and construction of new infrastructure including loading docks for 444 truck trailers, 968 vehicle parking spaces, six new public streets, water quality basins, utility systems, exterior lighting, and signage. The development will result in 44 acres of impervious surface with roughly 10 percent designated for landscape coverage. All activities must comply with Rancho Cucamonga Municipal Code §17.66.110 (Class C Performance Standards), which enforce strict ambient standards for noise, particulate matter, air contaminants, odor, heat, glare, and vibration to ensure emissions remain undetectable to the average person beyond property lines and that no perceptible odors escape site boundaries. Environmental compliance is further governed by CEQA guidelines, SCAQMD rules, CARB 2010 engine standards for trucks, and CALGreen Code requirements for green building practices. The project site is located on Arrow Route and Juneberry Drive, with all work to be performed on-site in the City of Rancho Cucamonga, under oversight by the City’s Planning and Engineering departments. The City will conduct regular inspections and hold final acceptance authority, ensuring adherence to all technical specifications, stormwater Best Management Practices outlined in Exhibit C, and California Building Energy Code standards. Proposal submissions must include mandatory attachments such as existing condition photos, BMP design calculations, and drainage plans, and are due by November 17, 2025, via the CEQAnet portal or through mailed deliverables to the Planning Department. While no formal contract value, pricing structure, or clause identifiers from FAR Part 52 are available, the procurement context suggests a public works initiative requiring environmental documentation and code compliance as core evaluation criteria. Key administrative contacts include Christine Delostrinos as Senior Planner and Chris Sanford of Thienes Engineering, Inc. as Director of Engineering, though no formal COR, COTR, or PCO designations have been publicly identified. No subcontracting requirements, socioeconomic set-asides, or invoicing protocols such as WAWF are specified, and contractual payment terms, accounting codes, or delivery schedules remain unstated in the available documentation.
Other Heavy and Civil Engineering Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS