River Vista Public Access Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The River Vista Public Access Project, managed by the San Joaquin River Conservancy, involves the development of public infrastructure located in Madera County, California, approximately one mile downstream from the Friant Dam. The scope of work includes the construction of a hiking and biking trail approximately 3,800 linear feet in length and eight feet wide, following an existing gravel road. The project will feature four natural scenic overlook areas, including one at the southern end of the trail adjacent to a planned emergency vehicle turnaround. Additionally, the project includes the creation of a 27-vehicle parking lot and two bus or recreational vehicle stalls in a previously disturbed area, as well as the removal of derelict bridge remnants from the San Joaquin River channel. The project was approved by the Wildlife Conservation Board on May 28, 2026, with a Notice of Determination issued on May 29, 2026, stating that the project will not have a significant environmental effect based on a Negative Declaration under CEQA. Administrative oversight is led by Executive Director Kari Daniska and Deputy Executive Director Rebecca J. Fris. The project is categorized under NAICS code 237990 and is associated with WCB Project Tracker IDs 2025096 and 2026058.

General Info

San Joaquin River Conservancy building trails, parking, and overlooks in Madera County, California.

Agency

California → San Joaquin River Conservancy

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Determination for San Joaquin River Parkway, River Vista Access Project

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin River Conservancy
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Joaquin River Conservancy
Office AddressN/A
Contacts
Kari DaniskaExecutive Director
Erin Aquino-CarhartSan Joaquin River Conservancy Program Manager

Full Description

Show more
The River Vista project proposes one mile trail extending the length of the project area along an existing gravel road. The trail will be approximately 3,800 linear feet in length, eight feet wide, and allow for hiking and biking. There will be four main natural overlook areas for scenic vistas. One of the overlooks will be located at the southern end of the trail adjacent to a natural overlook area for scenic vistas. One of the overlooks will be located at the southern end of the trail adjacent to a planned emergency vehicle turnaround. There will also be a 27 vehicle parking lot and two bus/recreational vehicle stalls located within an area that has been previously disturbed by past land uses. The project also includes the removal of the derelict bridge remnants within the San Joaquin River channel. WCB Project Tracker IDs: 2025096 and 2026058.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS