Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Bradley Channel - Jones to Main Street Repairs project, managed by the Santa Barbara County Flood Control District, involves the repair and replacement of concrete channel lining within a drainage ditch in Santa Maria, California. The scope of work includes the removal of an obsolete maintenance bridge to improve equipment access, the removal and re-grading of a 140 linear foot section of the east channel wall to install a new access ramp, and the replacement of deteriorating concrete lining along the western side of the channel for a 0.5 mile stretch between Jones Street and Main Street. All work must maintain the same general alignment and configuration as the existing facility. The project is scheduled for execution in two phases, with the bridge removal occurring in 2026 and the access ramp and concrete repairs following in 2027. This project is classified as categorically exempt under CEQA Section 15301 as it involves maintenance and minor alterations to an existing facility without expanding its use. The primary point of contact for the project is Environmental Manager Andrew Raaf. The work is categorized under NAICS code 237990 and is located in an area with no public access constraints.

General Info

Santa Barbara County will repair concrete channel lining and remove a bridge 2026-2027.

Agency

California → Santa Barbara County Flood Control District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Santa Maria, CA

Set-Aside

NONE

Documents

(1)

NOE Bradley Channel - Jones to Main Street Repairs 2026

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Barbara County Flood Control District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Santa Barbara County Flood Control District
Office AddressN/A
Contacts
Andrew RaafEnvironmental Manager

Full Description

Show more
The proposed project is to repair and replace components of an existing concrete channel lining in a drainage ditch (Bradley Channel). An existing maintenance bridge over the channel is no longer needed and impairs equipment access through the channel; the bridge will be removed. A 140 linear foot section of concrete along the east channel wall will be removed and re-graded to install a new access ramp. The concrete lining along the western side of the channel is deteriorating and needs to be removed and replaced with new concrete in sections from Jones Street to Main Street (0.5 miles). The project will be completed in two phases, with the bridge removal in 2026 and the remaining access ramp and concrete repairs and replacement in 2027. The area is an existing concrete drainage facility with no public access constraints.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 22 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS