TD2438742 Central Avenue Deteriorated Pole Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves replacing a deteriorated wood pole, identified as Pole 4525522E, along with its ground rod, using a new composite pole installed within a plastic sonotube. This work includes the removal of an existing berm surrounding the pole and the restoration of approximately 80 feet of a pre-existing drainage channel to its original grade, ensuring proper water flow and environmental compliance. The effort is part of infrastructure maintenance to enhance reliability and reduce long-term maintenance needs by transitioning from wood to a more durable composite material. The project is administered by the State Water Resources Control Board under the California office, with environmental oversight and coordination. Robert Stoddard, the Environmental Scientist, serves as the primary point of contact for inquiries, while Victoria Parsons, Senior Manager of Wetlands and Water Quality at SCE, is listed as an additional contact, indicating collaboration with utility partners. The forecast was posted on June 4, 2026, suggesting planning for future action, with the work location in California, though no specific city or zip code is provided. The project emphasizes environmental restoration as a key component, aligning with the agency’s mandate to protect water quality and natural drainage systems.

General Info

Replace Pole 4525522E with composite pole, restore 80-ft drainage channel, comply with environmental standards.

Agency

California → State Water Resources Control Board

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → State Water Resources Control Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → State Water Resources Control Board
Office AddressN/A
Contacts
Robert StoddardEnvironmental Scientist
Victoria ParsonsSenior Manager, Wetlands and Water Quality

Full Description

Show more
The purpose of the project is to replace one wood pole (Pole 4525522E) and ground rod with a new composite pole in a plastic sonotube, remove an existing berm around the pole, and restore approximately 80 feet of an existing drainage channel to original grade.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 12 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 18 hours ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS