CMP Rehabilitation Outside of Right-Of-Way Phase III - Measure P / CIP No. DRN0219

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Chula Vista is implementing the CMP Rehabilitation Outside of Right-Of-Way Phase III project, identified as CIP No. DRN0219. This project involves the rehabilitation of corrugated metal pipes at 23 citywide locations using trenchless pipe-lining methods. Cured-In-Place Pipe (CIPP) will be used for pipes with a diameter of less than 30 inches, while Geopolymer Pipe linings will be applied to pipes 30 inches or larger. The scope of work includes cleaning the pipes, filling depressions with mortar concrete, installing liners via pull-in, spray, or spin-cast application methods, and performing final closed-circuit television inspections. Six specific locations, numbered 16, 17, 18, 20, 21, and 22, are situated within or adjacent to Multiple Species Conservation Plan open space preserve lands. Consequently, these sites require the implementation of avoidance and minimization measures during construction as mandated by Section 7.5.2 Adjacency Management Issues of the City's MSCP Subarea Plan. The project has been determined exempt from the California Environmental Quality Act under Sections 15301 and 15302, as it is expected to have no significant environmental impacts. Harold Phelps serves as the primary point of contact for the lead agency.

General Info

City of Chula Vista rehabilitating corrugated metal pipes at 23 citywide locations.

Agency

California → City of Chula Vista

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

23 Locations Citywide, Chula Vista, CA 91910-91915, Chula Vista, CA, 91910

Set-Aside

NONE

Documents

(1)

NOE DRN0219 CMP Rehabilitation Outside Right-of-Way Phase III

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Chula Vista
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Chula Vista
Office AddressN/A
Contacts
Harold PhelpsAssociate Planner

Full Description

Show more
The project proposes to rehabilitate CMP pipes located outside City Right-Of-Ways using trenchless pipe-lining methods, including Cured-In-Place Pipe (CIPP) and Geopolymer Pipe linings. CIPP will be utilized for existing pipes measuring less than 30 inches in diameter while Geopolymer Pipe liner will be used for pipes measuring 30 inches or greater in diameter. For each of these pipe-lining methods, construction activities will include cleaning the pipe; filling depressions with mortar concrete; installing the liner via pull in method, spray application method, or spin-cast application method, as applicable; and conducting the final closed circuit televisions inspection. Of the 23 locations where CMP lining is proposed, six (6) locations (#16, #17, # 18, #20, #21, #22) are within or adjacent to Multiple Species Conservation Plan (MSCP) open space preserve lands and will require Avoidance and Minimization Measures to be implemented during construction in accordance with Section 7.5.2 Adjacency Management Issues of the City's MSCP Subarea Plan.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 22 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS