Comfort Inn & Suites Repair OWTS Project (CEQ 26-018)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves targeted repairs and upgrades to the existing onsite wastewater treatment system at the Comfort Inn & Suites Sequoia Kings Canyon, a 103-room hotel in California, to address regulatory noncompliance and improve system performance without altering the property’s size, occupancy, or operational scope. Work includes installing a new 15,000-gallon primary septic tank, repurposing the existing tank as a pre-anoxic chamber, adding Orenco AX-MAX media bed filtration units, UV disinfection, digital flow meters, upgraded controls, and associated piping and electrical systems. Limited modifications will also be made to the existing drip/leach dispersal components to ensure continued compliance with state wastewater standards. No new rooms, buildings, or expanded services are proposed; the sole objective is to maintain current hotel operations by resolving existing wastewater system deficiencies and securing necessary environmental permits. Construction will be completed in six to eight weeks under a phased schedule to minimize disruption to hotel operations, with temporary pump-and-haul support available as needed. Operational controls will enforce flow limits, and all plumbing will be maintained in a leak-free condition throughout the process. The project is managed by Tulare County with oversight from the Chief Environmental Planner, Associate Director, and Planner III, while JUM, LLC serves as the applicant. The initiative is scoped strictly to remediate wastewater infrastructure, ensuring long-term regulatory compliance and uninterrupted service for the existing property without any change to land use or guest capacity.

General Info

Repair and upgrade wastewater system at 103-room hotel to ensure compliance, no changes to size or operations.

Agency

California → Tulare County

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

CEQ 26-018 Comfort Inn & Suites Repair OWTS Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Tulare County
Contacts4 people available
OfficeN/A
Organization / Agency
California → Tulare County
Office AddressN/A
Contacts
Gary MillsChief Environmental Planner
Michael WashamAssociate Director
Danielle FolkPlanner III

Full Description

Show more
The proposed Project is an existing Comfort Inn & Suites Sequoia Kings Canyon hotel, with 103 existing rooms, parking areas, pool/spa, onsite public water system, and an existing onsite wastewater treatment system. The proposed Project is limited to repair and modification of the existing onsite wastewater treatment system (OWTS) to address Water Board compliance issues, improve wastewater treatment and distribution, and support ongoing permit processing. The Project includes installation of a new 15,000-gallon primary septic tank, reuse of the existing 15,000-gallon tank as a pre-anoxic tank, new Orenco AX-MAX media bed filtration treatment units, UV disinfection, digital flow metering, controls, piping/electrical work, and repair, replacement, and limited modification of existing drip/leach dispersal components necessary to serve the existing hotel use and maintain compliance with applicable wastewater requirements of existing drip/leach dispersal components. The proposed Project does not propose new hotel rooms, new hotel buildings, new lots, expanded lodging operations, increased guest capacity, new retail/restaurant use, or a change in land use. The purpose is to maintain the existing hotel use while correcting wastewater system deficiencies and obtaining required environmental/permitting clearance. Short-term and construction-period controls include maintaining hotel plumbing in leak-free condition, operational controls to stay within permitted flow limits, temporary pump-and-haul/pump truck support as needed, and phased construction to maintain controlled hotel operations and site access. Construction is expected to follow a 6-8 week phased schedule after permits and long-­lead equipment are available.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS