Comfort Inn & Suites Repair OWTS Project (CEQ 26-018)

Forecast
CEQ 26-018State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves targeted repairs and upgrades to the existing onsite wastewater treatment system at the Comfort Inn & Suites Sequoia Kings Canyon, a 103-room hotel in California, to address regulatory noncompliance and improve system performance without altering the property’s size, occupancy, or operational scope. Work includes installing a new 15,000-gallon primary septic tank, repurposing the existing tank as a pre-anoxic chamber, adding Orenco AX-MAX media bed filtration units, UV disinfection, digital flow meters, upgraded controls, and associated piping and electrical systems. Limited modifications will also be made to the existing drip/leach dispersal components to ensure continued compliance with state wastewater standards. No new rooms, buildings, or expanded services are proposed; the sole objective is to maintain current hotel operations by resolving existing wastewater system deficiencies and securing necessary environmental permits. Construction will be completed in six to eight weeks under a phased schedule to minimize disruption to hotel operations, with temporary pump-and-haul support available as needed. Operational controls will enforce flow limits, and all plumbing will be maintained in a leak-free condition throughout the process. The project is managed by Tulare County with oversight from the Chief Environmental Planner, Associate Director, and Planner III, while JUM, LLC serves as the applicant. The initiative is scoped strictly to remediate wastewater infrastructure, ensuring long-term regulatory compliance and uninterrupted service for the existing property without any change to land use or guest capacity.

General Info

Repair and upgrade wastewater system at 103-room hotel to ensure compliance, no changes to size or operations.

Agency

California → Tulare County

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Tulare County
Contacts4 people available
OfficeN/A
Organization / Agency
California → Tulare County
Office AddressN/A
Contacts
Gary MillsChief Environmental Planner
Michael WashamAssociate Director
Danielle FolkPlanner III

Full Description

Show more
The proposed Project is an existing Comfort Inn & Suites Sequoia Kings Canyon hotel, with 103 existing rooms, parking areas, pool/spa, onsite public water system, and an existing onsite wastewater treatment system. The proposed Project is limited to repair and modification of the existing onsite wastewater treatment system (OWTS) to address Water Board compliance issues, improve wastewater treatment and distribution, and support ongoing permit processing. The Project includes installation of a new 15,000-gallon primary septic tank, reuse of the existing 15,000-gallon tank as a pre-anoxic tank, new Orenco AX-MAX media bed filtration treatment units, UV disinfection, digital flow metering, controls, piping/electrical work, and repair, replacement, and limited modification of existing drip/leach dispersal components necessary to serve the existing hotel use and maintain compliance with applicable wastewater requirements of existing drip/leach dispersal components. The proposed Project does not propose new hotel rooms, new hotel buildings, new lots, expanded lodging operations, increased guest capacity, new retail/restaurant use, or a change in land use. The purpose is to maintain the existing hotel use while correcting wastewater system deficiencies and obtaining required environmental/permitting clearance. Short-term and construction-period controls include maintaining hotel plumbing in leak-free condition, operational controls to stay within permitted flow limits, temporary pump-and-haul/pump truck support as needed, and phased construction to maintain controlled hotel operations and site access. Construction is expected to follow a 6-8 week phased schedule after permits and long-­lead equipment are available.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 6 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, fence installation covering 500 meters, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. The work must adhere to specific standards, including the Agency Guide to Cave and Mine Gates 2009 and a Physical Mine Hazards Risk Assessment. The anticipated contract start date is January 7, 2026, with a primary term of two years and an option to extend for one additional year. The selection process is a three-stage evaluation. Stage 1 verifies mandatory requirements, while Stage 2 evaluates technical capabilities, requiring a minimum score of 70% to proceed. Technical evaluation focuses on project experience, roles and responsibilities, occupational health and safety, and a plan for Indigenous community beneficial participation. Stage 3 is a commercial evaluation based on the lowest bid price. Bidders must provide a detailed methodology, a Gantt chart schedule, and focused resumes for key personnel, including a Professional Engineer and various technical leads. Mandatory requirements include proof of W.S.I.B coverage, insurance, and tax compliance verification.
Energy and Mines

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 7 hours ago

DEADLINE

in about 1 year
View Details
NAICS: 237990
New
SLED
Carroll Creek Stream Restoration - CIP# 350007 (MWBE Goals)
Solicitation # IFB-27-11
The Carroll Creek Stream Restoration project (CIP# 350007), issued by the City of Frederick, Maryland under solicitation IFB-27-11, is a comprehensive construction effort located near Old Gas House Pike. The scope of work includes in-stream structure installation, floodplain bench grading, bank stabilization, and extensive planting. Key technical requirements involve the use of a Stream Restoration Plan, supplemental specifications, and the installation of reinforced soil lifts, riparian seed mixes, and various culverts. The project has an estimated value of approximately 6.88 million dollars and is expected to be completed within 180 days of the Notice to Proceed. Bidders must comply with strict submission requirements via the OpenGov Portal, including a detailed electronic project schedule and a list of three equivalent projects completed within the last four years. The contract emphasizes socioeconomic goals with participation targets of 31 percent for MBE, 11 percent for WBE, and 2 percent for SDVOSB. Financial security is mandated through a 5 percent bid bond, followed by 100 percent performance and materialmen bonds upon award, and a two-year maintenance bond upon final acceptance. Contract administration includes a two-year guarantee on all work and materials, with liquidated damages set at 500 dollars per calendar day for delays beyond the substantial completion date. The City of Frederick reserves the right to withhold payment if the required progress schedule is not submitted. Evaluation for award is based on the vendor's responsiveness to material requirements and their overall responsibility, including technical capability, integrity, and performance record.
Engineering

POSTED

about 9 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
SLED
Northside Park Site Improvements
Solicitation # RFP #27032
The County of Greenville is soliciting proposals from qualified general contractors for site improvements at Northside Park in Taylors, South Carolina. The scope of work includes comprehensive renovations involving demolition of existing pavement, fencing, and amenities, as well as the installation of new heavy-duty concrete paving, a 27'x40' pavilion shade structure, and expanded athletic courts including additional pickleball courts. The project also encompasses site work, grading, stormwater treatment, and landscaping, including the installation of sod and specific UltraSite branded park furniture. All work must adhere to building codes and the full intent of ADA Title II guidelines. The project is scheduled to begin with a Notice to Proceed on December 28, 2026, with construction starting January 1, 2027, and a desired completion date of May 15, 2027. Proposals are evaluated on a 25-point scale across five equally weighted categories: responsiveness, experience, references, pricing, and project-specific approach. Awarded contractors must provide a Performance and Payment Bond for the total contract price and maintain all required insurance. Payment is based on monthly invoicing with a 30-day term, and the County will withhold 10 percent of each payment until the project is satisfactorily completed. Liquidated damages of $250 per day apply if the work is not completed within 90 calendar days of the Notice to Proceed. All submissions must be received electronically via the County's procurement portal by November 25, 2026.
PARKS ADMINISTRATION

POSTED

about 9 hours ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS