Spring Valley Community Center Parking Improvements (Planning Record Number: PL-25-419)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Spring Valley Community Center parking improvements project aims to upgrade the existing gravel parking area to meet ADA accessibility standards, enabling the facility to function as an officially recognized Community Resource Center during emergencies such as Public Safety Power Shutoffs and catastrophic wildfires. Currently, the lack of an accessible parking lot and pathway disqualifies the center from being utilized by PG&E, FEMA, and OES for emergency response services, forcing residents to travel over ten miles to Clearlake for critical assistance. The project will involve removing four inches of existing gravel, conditioning the soil, adding a one-inch layer of Class II gravel base, and installing a four-inch hot mix asphalt surface, totaling approximately 45 cubic yards of fill. Two ADA-compliant parking stalls will be constructed with concrete, accompanied by a ramp and accessible pathway leading to the building entrance, with potential modifications to the building’s threshold to ensure full compliance. Construction is scheduled to last 10 working days during the dry season, with work hours from 7:00 a.m. to 5:00 p.m., Monday through Friday, using standard equipment such as a paver, bobcat, and roller, all staged within the existing disturbed areas. Best Management Practices including hay waddles and silt fencing will be implemented to control erosion and stormwater runoff, with no tree or vegetation removal planned. The site is largely flat, with slopes under 10 percent, and all activities will remain at least 200 feet away from Wolf Creek, located behind the buildings. The project is managed by Lake County, with Michelle Irace as the primary point of contact, and is recorded under Planning Record Number PL-25-419, seeking to significantly enhance community resilience by ensuring emergency access and services are available locally.

General Info

Upgrade gravel parking to ADA-compliant asphalt with two stalls and ramp for emergency response access.

Agency

California → Lake County

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Wolf Creek Rd; Chalk Mountain Rd, CA, 95423

Set-Aside

NONE

Documents

(1)

NOE SVCC PL25-419 Spring Valley Community Center Parking Improvements

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Lake County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Lake County
Office AddressN/A
Contacts
Michelle IraceSenior Planner
Robin BorreDirector of Special Districts

Full Description

Show more
BACKGROUND: The Spring Valley Community Center is used for hosting Advisory Committee meetings, Property Owner Association meetings, as well as a host of community related functions such as breakfasts, game nights, and themed community gatherings. The facility also functions as a central location in the event of emergencies within the community such as wildfires and storm events. However, during Public Safety Power Shutoffs (PSPS) the community center cannot been used as a Community Resource Center (CRC) by PG&E due to the lack of an ADA accessible parking lot (which is currently gravel) and path of travel to the center. Because of this, PG&E cannot use the center to provide essential services to the community. The nearest CRC is located over ten miles away in Clearlake. Additionally, the facility cannot qualify as Local Assistance Center (LAC) in the event of catastrophic wildfire. This project seeks to remedy that by providing a paved parking lot for the facility which meets ADA standards. This will allow the facility to be formally recognized by FEMA, OES, and PG&E as a Community Resource Center, providing much needed services to the community in the event of another emergency. DESCRIPTION OF PROJECT: The project will entail scarifying the existing gravel parking area approximately 4 inches and moisture conditioning. This would be followed by adding additional class II gravel base rock to the surface, approximately 1- inch, grading to a smooth level surface and compacting. Placement of a 4-inch hot mix asphalt surface and striping of the parking lot would follow. The project would entail approximately 45 cy of total fill. Two ADA compliant parking stalls will be constructed at the entrance to the Community Center along with accessible pathway and a ramp to get to the landing. The parking stalls may be constructed out of concrete which would require excavation of approximately 4 inches to provide the required concrete thickness. The ADA compliant stalls would be followed by parking stall striping and accessible path striping to complete the project. There may be the need to modify the existing threshold of the Community Center to make it ADA accessible. Construction would last approximately 10 days, Monday through Friday, from 7:00 a.m. to 5:00 p.m. Equipment used would be a paver, small grader or bobcat and a roller. Staging would occur within the existing disturbed (graveled) areas of the parcel. Construction would occur during the dry season and standard stormwater and erosion control Best Management Practices (BMPs), such as hay waddles and silt fencing, would be deployed as needed. No trees or vegetation would be removed. The site is flat with slopes mapped less than 10 percent, with the exception of areas along Wolf Creek that traverses the southern portion of the site (behind the existing buildings). All activities would occur within the disturbed footprint, would avoid the creek, and be located a minimum of 200 ft away from the creek and on the other side of the existing buildings and roads.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS