Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Dock Retrofit at Berth G242 – Harbor Development Permit No. 26-022

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Port of Long Beach is overseeing the retrofit of a damaged dock located at Pier G, Berth G242 in Long Beach, California, under Harbor Development Permit No. 26-022. The scope of work involves the installation of seven embedded piles, each 50 feet long and 18 inches in diameter, and a new 40-foot by 82-foot floating platform equipped with three mooring slots. To support the project, the site will include the temporary placement of two trailers, one measuring 60 feet by 12 feet and another 60 feet by 60 feet, both 10 feet in height with utility connections, as well as temporary perimeter fencing up to 12 feet high. All removed equipment must be disposed of according to federal, state, and local environmental regulations. The project is managed by the Port of Long Beach City of Long Beach Harbor Department Environmental Planning Division, with Ruben Trigueros serving as the Capital Projects Coordinator and Tyler Hanks as the lead agency contact. This initiative has been granted a Notice of Exemption under the California Environmental Quality Act, as it qualifies for categorical exemptions regarding minor alterations and the replacement of small structures without significant environmental impact. The work is situated within Harbor Planning District 8 in the Southeast Harbor of Los Angeles County.

General Info

Port of Long Beach retrofit of Pier G dock with piles and floating platform.

Agency

California → Long Beach, Port of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Long Beach, CA

Set-Aside

NONE

Documents

(1)

HDP - 26-022 Notice of Exemption for Dock Retrofit at Berth G242

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Long Beach, Port of
Contacts2 people available
OfficeN/A
Organization / Agency
California → Long Beach, Port of
Office AddressN/A
Contacts
Ruben TriguerosCapital Projects Coordinator IV
Tyler HanksEnvironmental Specialist Intern

Full Description

Show more
Retrofit of an existing damaged dock involving the installation of seven (7) embedded piles, approximately 50 feet long and 18 inches in diameter, and a new 40-foot by 82-foot floating platform with three mooring slots. The project also includes the temporary placement of a 60-feet long by 12-feet wide trailer and a 60-feet long by 60-feet wide trailer, both approximately 10-feet in height with associated utility connections, as well as the installation of temporary fencing along the site perimeter, up to 12-feet in height.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 10 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 23 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS