Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Beaumont Master Drainage Plan Line 2, Stage 1

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Beaumont Master Drainage Plan Line 2, Stage 1 project involves the installation of approximately 5,000 linear feet of 84-inch to 102-inch reinforced concrete pipe (RCP) along 6th St, Pennsylvania Ave, and E 1st St in the City of Beaumont, Riverside County, California. The project aims to manage future drainage flows and reduce flooding risks by installing the RCP at a depth of no more than 25 feet. Key infrastructure components include manholes for maintenance access at intervals of no more than 500 feet, as well as various inlets and outlets. Specific modifications are required at Berkshire Avenue, where outlets will be lowered by 2 feet and exit pipe sizes will increase, necessitating the reconstruction of headwalls and surrounding grading. The project involves the removal of 13,000 cubic yards of material and the backfilling of 5,000 cubic yards, with water being permanently diverted away from eastern channels. To ensure safety and environmental compliance, the project incorporates traffic control measures, including signs, barriers, and flaggers, and employs best management practices such as silt fences and basins for soil erosion control. The project has undergone extensive environmental review under the California Environmental Quality Act (CEQA), resulting in a Negative Declaration. Comprehensive studies have been completed regarding air quality, greenhouse gas emissions, construction noise, and biological resources, including a Determination of Biologically Equivalent or Superior Preservation (DBESP) report. Additionally, paleontological and cultural resource surveys were conducted, with recommendations for archaeological monitoring during construction. The project is coordinated through the City of Beaumont Public Works Department and involves oversight from agencies such as the State Water Resources Control Board and the U.S. Army Corps of Engineers.

General Info

Installation of 5,000 feet of concrete pipe for drainage in Beaumont, California.

Agency

California → City of Beaumont

Place of Performance

Begin at E 6th St and Chestnut and terminate at E 1st St and Berkshire Ave, Beaumont, CA, 92223

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Beaumont
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Beaumont
Office AddressN/A
Contacts
Dustin ChristensenPrincipal Engineer

Interested Companies (1)

Chambers GroupCosta Mesa, CA

Full Description

Show more
Construction of approximately 5,000 linear feet of 84-inch to 102-inch RCP along 6th St, Pennsylvania Ave, and E 1st St in the City to handle anticipated future flows. The outlets at Berkshire Avenue will be lowered by 2 feet, and the exit pipe size will increase, requiring reconstruction of the headwalls and grading around the outlet accordingly.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 4 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 7 hours ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS