Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Roscomare Elementary School Playground and Campus Exterior Upgrades Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Roscomare Elementary School Playground and Campus Exterior Upgrades Project is a comprehensive renovation effort managed by the Los Angeles Unified School District with an approved budget of 12,201,794 dollars. The scope of work focuses on replacing approximately 80,000 square feet of paving in the main and kindergarten playgrounds, applying solar reflective coatings, and installing new playground equipment and an outdoor learning environment. Additional improvements include campus-wide greening and landscaping, the installation of privacy fencing, exterior painting of buildings, and critical infrastructure upgrades to the trash enclosure, sanitary sewer, storm drainage, and overall site accessibility. The project is located at the Roscomare Elementary School campus in Los Angeles and must be implemented in accordance with the LAUSD Standard Conditions of Approval adopted in December 2023, as well as all applicable state, federal, and local regulations. Key compliance requirements include nesting bird surveys per SC-BIO-3, strict subsurface discovery protocols for archaeological or hazardous materials, and construction waste recycling mandates under SC-USS-1. The project qualifies for categorical exemptions under CEQA Guidelines 15301, 15302, and 15304, as it involves minor alterations and replacements without expanding the use of the facility. Christy Wong serves as the CEQA Project Manager for the initiative.

General Info

Roscomare Elementary to upgrade playgrounds, install solar-coated surfacing, new equipment, landscaping, and infrastructure for $12.2M.

Agency

California → Los Angeles Unified School District

Place of Performance

Los Angeles, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles Unified School District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles Unified School District
Office AddressN/A
Contacts
Christy WongCEQA Project Manager

Full Description

Show more
The Project will replace approximately 80,000 square feet of existing paving in the main and kindergarten playgrounds that has exceeded its useful life with new paving. The scope of work also includes solar reflective coating of the playgrounds; replacement of playground equipment; installation of an outdoor learning environment; greening and landscaping throughout the Campus; installation of privacy fencing; and exterior painting of buildings and structures where needed. The Project will also provide infrastructure upgrades including upgrades to an existing trash enclosure, sanitary sewer and storm drainage utilities upgrades, and accessibility upgrades (Figure 1). The Los Angeles Unified School District Board of Education approved the Project's budget of $12,201,794 on January 14, 2025. The Project will be implemented per all applicable State, federal, and local regulations, as well as all District Standards and Specifications; such as those provided in the updated Standard Conditions of Approval for District Construction, Upgrade, and Improvements Projects (SCs) as adopted by the Board of Education in December 2023. LAUSD’s SCs, design guidelines, and best management practices are designed to be incorporated into the Project design in order to avoid or limit potential adverse impacts associated with the District’s projects. The beneficiaries of the Project include Roscomare ES students, faculty, staff, families, school supporters, and the community at large who may request access to the playground pursuant to the Civic Center Act (CA Ed. Code Sections 38130 -38139).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project involves designing and constructing manholes, estimated to be between 10 and 25 feet deep, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal through-seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques in accordance with USACE Engineering Regulation 1110-1-1807. Key deliverables include a professional engineer-approved Drilling and Invasive Program Plan, temporary flood protection plans, and final as-built drawings. This is a two-phase selection process, with Phase 1 focusing exclusively on qualifications and technical approach without the submission of pricing. The government intends to select up to three qualified offerors for Phase 2, evaluating candidates based on performance confidence and technical qualifications, with non-price factors weighted significantly more than price. The project is categorized under NAICS code 237990 with a small business size standard of 45 million dollars. While the estimated project magnitude is between 1 million and 5 million dollars, the total contract award amount, including both design and construction, shall not exceed 3.4 million dollars. The final award will be a firm-fixed-price contract requiring 100 percent performance and payment bonds.
W071 Endist Kansas City

POSTED

about 5 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
This total small business set-aside requirement, identified by solicitation number GROUP1-27-R-J001, involves maintenance dredging within the Pass-a-Grille Pass in Pinellas County, Florida. The scope of work includes the transport and placement of excavated material onto the Pass-a-Grille Beach Placement Area, along with incidental services such as MEC construction support, environmental and water quality monitoring, beach fill quality control, screening, vibration control, and beach tilling. The project falls under NAICS code 237990 for Dredging and Surface Cleanup Activities, with a small business standard of 37 million dollars and a price target range between 5 million and 10 million dollars. This opportunity is restricted to a specific group of contractors previously awarded contracts under solicitation W912EP25R0010, including AGM Marine Contractors Inc., AHTNA Marine and Construction Company LLC, Atlantic and Gulf Dredging and Marine LLC, Coastal Dredging Co., Inc., Cottrell Contracting Corporation, Next Generation Logistics LLC, Southern Dredging Co, Inc., Southwind Corporation Corp., and Waterfront Property Services LLC Gator Services. The period of performance is 120 calendar days following the receipt of the Notice to Proceed, with work required to commence within 60 calendar days of that notice. Proposals are due on or about 20 November 2026, and all eligible vendors must be registered in the System for Award Management to be considered for the award.
W074 Endist Jacksnvlle

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. Managed by the US Army Corps of Engineers New York District with the New Jersey Department of Environmental Protection as the non-Federal sponsor, the project focuses on reducing storm damages from coastal erosion and flooding. The scope of work involves the design and construction of two wetland mitigation sites: the Pews Creek freshwater wetland and the Compton Creek tidal wetland. Key deliverables include the restoration of approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands, with a specific performance requirement of achieving 85 percent aerial coverage of plantings in freshwater forested areas within three to five years post-construction. The project magnitude is estimated between 15 million and 30 million dollars, and the government will award a firm fixed-price contract based on a best-value tradeoff. The selection process is conducted in two phases per FAR 36.3; Phase One qualifies offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Phase Two evaluations consider technical approach, management, and a small business participation plan, which combined are approximately equal in importance to price. Proposals for Phase One were due by October 19, 2026. The contract requires strict adherence to NJDEP hazardous waste standards, Davis-Bacon Act labor regulations, and specific electronic data delivery formats.
W2SD Endist New York

POSTED

about 5 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 5 hours ago

DEADLINE

in 22 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS