California Stream Gage Improvement Program

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Tehama County Flood Control and Water Conservation District is implementing the California Stream Gage Improvement Program to install a stream gage unit at Mill Creek, located approximately three miles southeast of Mineral, California. Funded by a statewide DWR grant, the project aims to modernize the surface water monitoring network to enhance flood forecasting, emergency response, water supply planning, and groundwater-surface water interaction tracking. The installation will provide real-time hydrologic data to the California Data Exchange Center to support regional water management and environmental stewardship. The scope of work includes the installation of a remote terminal unit consisting of a data logger, bubbler unit, solar/battery system, and radio equipment housed in a steel enclosure, along with a staff gage and connecting conduit. The project is designed to have non-significant impacts on terrestrial wildlife, with no proposed vegetation removal or earth disturbance. This effort is categorized as exempt under CEQA Sections 15304, 15302, and 15306. Justin Jenson, Deputy Director of Public Works for Water Resources, serves as the primary point of contact for the project.

General Info

Install stream gage on Mill Creek for real-time hydrologic data, no vegetation removal, supports flood and water management.

Agency

California → Tehama County Flood Control and Water Conservation District

Place of Performance

Just upstream of the Hole-in-the-Ground Campground, located approx. 3 miles SE of Mineral, CA, Mineral, CA, 96061

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Tehama County Flood Control and Water Conservation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Tehama County Flood Control and Water Conservation District
Office AddressN/A
Contacts
Justin JensonDeputy Director of Public Works – Water Resources

Full Description

Show more
As part of the California Stream Gage Improvement Program (CalSIP), the County is proposing to install one stream gage unit to record streamflow data at Mill Creek (Project). The CalSIP project aims to expand and modernize the county’s surface water monitoring network to support improved flood management, water reliability, and ecosystem protection. CalSIP is a statewide DWR grant program designed to help public agencies upgrade, reactivate, or install new stream gaging stations that monitor real-time hydrologic conditions and contribute data to the California Data Exchange Center (CDEC). The program strengthens water management capabilities by filling critical data gaps in natural waterways. Within Tehama County, this project supports the District’s long-term water management responsibilities by enhancing the accuracy and availability of streamflow data essential for (1) Flood forecasting and emergency response, (2) Groundwater–surface water interaction tracking, (3) Water supply planning, and (4) Environmental stewardship and regulatory compliance. The project site, includes (1) a remote terminal unit (RTU) that consists of a data logger, bubbler unit, solar/battery system, and radio equipment housed in a steel enclosure, (2) conduit routed from the RTU to the toe of the streambed where it terminates, and (3) a staff gage will be installed in the streambed adjacent the conduit. The project will have non-significant impact to local movement patterns of terrestrial wildlife species. Temporary effects due to noise and increased human activity during project activities should not interfere with these local movement patterns over time or affect the ability of these species to forage or reproduce. No removal of vegetation and no earth disturbance is proposed. Additionally, various Best Management Practices are proposed to be implemented to reduce any impacts.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 13 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 15 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS