California Stream Gage Improvement Program

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Tehama County Flood Control and Water Conservation District is implementing the California Stream Gage Improvement Program to install a stream gage unit at Mill Creek, located approximately three miles southeast of Mineral, California. Funded by a statewide DWR grant, the project aims to modernize the surface water monitoring network to enhance flood forecasting, emergency response, water supply planning, and groundwater-surface water interaction tracking. The installation will provide real-time hydrologic data to the California Data Exchange Center to support regional water management and environmental stewardship. The scope of work includes the installation of a remote terminal unit consisting of a data logger, bubbler unit, solar/battery system, and radio equipment housed in a steel enclosure, along with a staff gage and connecting conduit. The project is designed to have non-significant impacts on terrestrial wildlife, with no proposed vegetation removal or earth disturbance. This effort is categorized as exempt under CEQA Sections 15304, 15302, and 15306. Justin Jenson, Deputy Director of Public Works for Water Resources, serves as the primary point of contact for the project.

General Info

Install stream gage on Mill Creek for real-time hydrologic data, no vegetation removal, supports flood and water management.

Agency

California → Tehama County Flood Control and Water Conservation District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Just upstream of the Hole-in-the-Ground Campground, located approx. 3 miles SE of Mineral, CA, Mineral, CA, 96061

Set-Aside

NONE

Documents

(1)

2026-08-05 California Stream Gage Improvement Program CEQA NOE

PDFceqa-noe

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Tehama County Flood Control and Water Conservation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Tehama County Flood Control and Water Conservation District
Office AddressN/A
Contacts
Justin JensonDeputy Director of Public Works – Water Resources

Full Description

Show more
As part of the California Stream Gage Improvement Program (CalSIP), the County is proposing to install one stream gage unit to record streamflow data at Mill Creek (Project). The CalSIP project aims to expand and modernize the county’s surface water monitoring network to support improved flood management, water reliability, and ecosystem protection. CalSIP is a statewide DWR grant program designed to help public agencies upgrade, reactivate, or install new stream gaging stations that monitor real-time hydrologic conditions and contribute data to the California Data Exchange Center (CDEC). The program strengthens water management capabilities by filling critical data gaps in natural waterways. Within Tehama County, this project supports the District’s long-term water management responsibilities by enhancing the accuracy and availability of streamflow data essential for (1) Flood forecasting and emergency response, (2) Groundwater–surface water interaction tracking, (3) Water supply planning, and (4) Environmental stewardship and regulatory compliance. The project site, includes (1) a remote terminal unit (RTU) that consists of a data logger, bubbler unit, solar/battery system, and radio equipment housed in a steel enclosure, (2) conduit routed from the RTU to the toe of the streambed where it terminates, and (3) a staff gage will be installed in the streambed adjacent the conduit. The project will have non-significant impact to local movement patterns of terrestrial wildlife species. Temporary effects due to noise and increased human activity during project activities should not interfere with these local movement patterns over time or affect the ability of these species to forage or reproduce. No removal of vegetation and no earth disturbance is proposed. Additionally, various Best Management Practices are proposed to be implemented to reduce any impacts.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 22 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS